Industrial Solar Gurugram: Tariffs, Net Metering, ROI 2026
Gurugram factory solar: DHBVN HT tariff ₹6.95/kVAh + ₹290/kVA, HERC net metering cap 500 kW, 90% feed-in settlement, ToD rebates and realistic payback for 2026.
Sun Wave Knowledge Centre
Guides, case studies, and industry updates to help you make informed decisions about solar energy for your business.
Gurugram factory solar: DHBVN HT tariff ₹6.95/kVAh + ₹290/kVA, HERC net metering cap 500 kW, 90% feed-in settlement, ToD rebates and realistic payback for 2026.
Noida factory solar: NPCL HV-2 tariff with the 10% regulatory discount, UPERC net billing (not net metering), 2 MW cap, data-centre demand and payback for 2026.
UPERC RSPV Regulations 2019 (to the 2025 Third Amendment) for Uttar Pradesh factories: why C&I gets net billing, the 2 MW cap, Solar Injection Compensation and FY 2026-27 tariffs.
Green Energy Open Access Rules 2022 explained: 100 kW eligibility, 15-day GOAR approval, banking, CSS and surcharge caps, and both 2023 amendments for C&I buyers.
HERC's 7th Supply Code amendment lifts the surcharge-free excess-demand limit to 110% and caps load-reduction fees at ₹20,000. What Haryana factories should do.
MNRE's August 5 2026 ALMM List-II clarification exempts net-metering and open-access solar projects from domestic cell rules till Dec 31 2026. C&I buyer guide.
Complete voltage-wise Karnataka solar open access cost framework using KERC tariff order — wheeling, CSS, additional surcharge, banking, landed cost
SECI 1 GW firm and dispatchable renewable energy round-the-clock tender with storage discovers Rs 5.25/kWh lowest tariff in August 2026
TANGEDCO (now TNPDCL/TNGECL) open access solar charges FY2026-27: wheeling, cross-subsidy surcharge, additional surcharge, banking rules, and landed cost worked example.
India solar power generation surged 138% from 73 BU in FY22 to 175 BU in FY26, with solar share hitting 9.5% of total electricity output
Voltage-wise Maharashtra solar open access cost using MERC FY2026-27 tariff order: wheeling, cross-subsidy surcharge, additional surcharge and landed cost.
MNRE 50th ALMM List-I revision adds 12.7 GW solar module capacity to 217 GW total with seven new manufacturers, August 2026