Industrial rooftop solar for factories in Rohtak
UHBVN area · Rohtak, Haryana

Rohtak factory solar: 100 kW at ₹23,000/kW

CAPEX rooftop solar for IMT Rohtak, the Industrial Development Colony and the Sampla belt. Rohtak's fastener, forging and auto-component plants carry heavy daytime loads that a rooftop plant offsets directly.

100 kW reference

₹23,000/kW

≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop

500 kW reference

₹22,000/kW

≈ ₹1.1 crore ex-GST; scale lowers per-kW cost

Power distribution company

UHBVN

Uttar Haryana Bijli Vitran Nigam (Rohtak operation circle)

Industrial areas covered

5 areas

IMT Rohtak Phases I & II (HSIIDC), IMT Rohtak Phase III, Industrial Development Colony (IDC)

How much does factory rooftop solar cost in Rohtak?

A 100 kW CAPEX rooftop system for a Rohtak factory costs about ₹23 lakh (₹23,000/kW) excluding GST with Sun Wave, and a 500 kW system about ₹1.1 crore (₹22,000/kW). Sizes in between are priced progressively, and the final quote follows a site survey of your roof, load and UHBVN connection.

Where we work

Industrial areas we cover in Rohtak

IMT Rohtak Phases I & II (HSIIDC)

HSIIDC township on the Delhi Road / NH-10 corridor.

IMT Rohtak Phase III

About 924 acres with a projected power demand of about 75 MW.

Industrial Development Colony (IDC)

About 207 plots and 175 producing units (DC-MSME district profile).

Sampla industrial belt

Packaging and aluminium-extrusion units; UHBVN runs a separate Sampla division.

Mega Food Park, Rohtak

Listed among the state's sectoral parks in the 2025 industrial policy.

Who we build for

Rohtak industries that suit rooftop solar

Fasteners

Rohtak is known as the city of fasteners; forging and heat-treatment loads run all day.

Automotive & auto components

IMT Rohtak hosts automotive R&D and supplier plants with multi-shift loads.

General engineering

Hundreds of machining units run mostly in day shifts.

Dairy & food processing

Chilling and processing loads pair well with solar.

Grid rules

UHBVN and Haryana rules for factory solar

Net metering up to 500 kW

Under HERC's 2021 rooftop regulations, net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower. Larger plants can use gross metering up to contract demand. Consumers drawing open-access power cannot also net-meter.

Source: HERC Rooftop Solar Regulations 2021

How surplus units are settled

Since HERC's 2nd Amendment (October 2025), surplus credits carry forward within a 1 October – 30 September settlement period. Credits left at the end are bought by the DISCOM at 90% of the feed-in tariff, so size the plant for daytime self-consumption.

Source: HERC 2nd Amendment, DHBVN circular D-23/2025

FY2026-27 industrial tariff

HT industrial supply (above 50 kW) pays ₹6.95/kVAh at 11 kV and ₹6.85/kVAh at 33 kV, plus ₹290/kVA/month of contract demand. Electricity duty, municipal tax and FSA are extra. There is no solar-hour rebate in the FY2026-27 schedule.

Source: HERC tariff order 25 Mar 2026 (DHBVN circular D-06/2026)

Applying to UHBVN

UHBVN runs its own rooftop portal (solarconnection.uhbvn.org.in). HERC rules require feasibility within 15 days and a Letter of Approval within 22 days; plants above 20 kWp also need a safety certificate from the Chief Electrical Inspector before commissioning.

Source: UHBVN rooftop solar FAQ

Green open access from 100 kW

Consumers with 100 kW or more of contract demand can buy green power through open access; since 2025 several connections in the same operation division can be clubbed to reach 100 kW. FY2026-27 HT charges include ₹0.73/kWh wheeling and ₹1.45/kWh cross-subsidy surcharge.

Source: HERC GEOA amendment 2025; DHBVN circular D-06/2026

Worked example

Payback on a 100 kW rooftop in Rohtak

ItemValueBasis
System cost₹23,00,000100 kW × ₹23,000/kW, ex-GST (Sun Wave reference)
Year-1 generation1,20,000 units100 kW × 1,200 kWh/kWp/year (Delhi Solar Policy, 2nd Amendment 2026)
Grid energy charge avoided₹6.95/kVAhHT industrial energy charge at 11 kV, FY2026-27 (HERC FY2026-27 order (DHBVN circular D-06/2026))
Year-1 saving≈ ₹8,34,0001,20,000 × ₹6.95
Simple payback≈ 2.8 yearsSystem cost ÷ year-1 saving

Illustrative only. Assumes the factory uses all solar output during working hours and counts the energy charge alone, treating one kVAh as one kWh (unity power factor). It excludes GST, demand charges, surcharges, panel degradation, O&M and financing. Your actual payback depends on your tariff category, load profile and roof. Try the solar savings calculator with your own bill.

Local context

What Rohtak factories should know

In March 2026 the IMT Udyog Welfare Association, Rohtak said a sharp rise in fixed charges on electricity bills had placed a heavy financial burden on industrialists.

Source: The Tribune, Mar 2026

HSIIDC's environmental filing for IMT Rohtak Phase III projects 75.44 MW (94.3 MVA) of power demand and lists general manufacturing, automobile and mechanical units as intended occupants.

Source: HSIIDC filing, Parivesh

Rohtak is in the National Capital Region, so CAQM Direction No. 76 applies: diesel DG sets may run only as backup, and older sets of 41–800 kW need dual-fuel kits or certified emission-control retrofits. Rooftop solar cuts the daytime units a DG set or the grid has to supply.

Source: CAQM Direction No. 76 (as amended 2024)

Frequently Asked Questions

Which electricity board handles solar net metering in IMT Rohtak?

IMT Rohtak and Rohtak's other industrial areas are served by UHBVN's Rohtak operation circle. Net-metering applications are filed on UHBVN's portal, solarconnection.uhbvn.org.in.

How long does UHBVN take to approve rooftop solar for a factory in Rohtak?

HERC rules require UHBVN to check technical feasibility within 15 days of acknowledging a complete application and to issue a Letter of Approval within 22 days. You then have 180 days to install the plant.

Does rooftop solar reduce fixed charges for Rohtak factories?

No. Solar reduces the energy units you buy, at ₹6.95/kVAh for 11 kV HT supply, but the ₹290/kVA/month contract-demand charge stays. The saving comes from avoided energy charges and reduced DG running.

How much does rooftop solar cost for a Rohtak factory?

Sun Wave's reference price is ₹23,000/kW excluding GST at 100 kW, about ₹23 lakh, and ₹22,000/kW at 500 kW, about ₹1.1 crore. The final price follows a site survey.

Rohtak solar guides

Nearby industrial locations

Get Your Free Quote

Two quick steps — most of it is just tapping. Our engineers come back within 24 hours with a custom design and savings estimate.

Your requirementStep 1 of 2
What kind of facility is it?
Monthly electricity bill

A rough range is fine — it sizes the system.

How would you like to pay for it?

Not sure is a perfectly good answer — we'll advise.

All optional.

Let's Power Your Business

Whether you run a factory, warehouse, or commercial facility - we have the perfect solar solution. Our team will design a system tailored to your energy needs and budget.

Phone
+91-8800477880
Email
shubham@sunwavetech.com
Address
Plot no. 10/11, Napco Bevel Gear, Faridabad, Haryana 121005
Working Hours
Mon-Sat: 9:00 AM - 6:00 PM