100 kW reference
₹23,000/kW
≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop

CAPEX rooftop solar for IMT Rohtak, the Industrial Development Colony and the Sampla belt. Rohtak's fastener, forging and auto-component plants carry heavy daytime loads that a rooftop plant offsets directly.
100 kW reference
₹23,000/kW
≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop
500 kW reference
₹22,000/kW
≈ ₹1.1 crore ex-GST; scale lowers per-kW cost
Power distribution company
UHBVN
Uttar Haryana Bijli Vitran Nigam (Rohtak operation circle)
Industrial areas covered
5 areas
IMT Rohtak Phases I & II (HSIIDC), IMT Rohtak Phase III, Industrial Development Colony (IDC)
A 100 kW CAPEX rooftop system for a Rohtak factory costs about ₹23 lakh (₹23,000/kW) excluding GST with Sun Wave, and a 500 kW system about ₹1.1 crore (₹22,000/kW). Sizes in between are priced progressively, and the final quote follows a site survey of your roof, load and UHBVN connection.
Where we work
HSIIDC township on the Delhi Road / NH-10 corridor.
About 924 acres with a projected power demand of about 75 MW.
About 207 plots and 175 producing units (DC-MSME district profile).
Packaging and aluminium-extrusion units; UHBVN runs a separate Sampla division.
Listed among the state's sectoral parks in the 2025 industrial policy.
Who we build for
Rohtak is known as the city of fasteners; forging and heat-treatment loads run all day.
IMT Rohtak hosts automotive R&D and supplier plants with multi-shift loads.
Hundreds of machining units run mostly in day shifts.
Chilling and processing loads pair well with solar.
Grid rules
Under HERC's 2021 rooftop regulations, net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower. Larger plants can use gross metering up to contract demand. Consumers drawing open-access power cannot also net-meter.
Source: HERC Rooftop Solar Regulations 2021Since HERC's 2nd Amendment (October 2025), surplus credits carry forward within a 1 October – 30 September settlement period. Credits left at the end are bought by the DISCOM at 90% of the feed-in tariff, so size the plant for daytime self-consumption.
Source: HERC 2nd Amendment, DHBVN circular D-23/2025HT industrial supply (above 50 kW) pays ₹6.95/kVAh at 11 kV and ₹6.85/kVAh at 33 kV, plus ₹290/kVA/month of contract demand. Electricity duty, municipal tax and FSA are extra. There is no solar-hour rebate in the FY2026-27 schedule.
Source: HERC tariff order 25 Mar 2026 (DHBVN circular D-06/2026)UHBVN runs its own rooftop portal (solarconnection.uhbvn.org.in). HERC rules require feasibility within 15 days and a Letter of Approval within 22 days; plants above 20 kWp also need a safety certificate from the Chief Electrical Inspector before commissioning.
Source: UHBVN rooftop solar FAQConsumers with 100 kW or more of contract demand can buy green power through open access; since 2025 several connections in the same operation division can be clubbed to reach 100 kW. FY2026-27 HT charges include ₹0.73/kWh wheeling and ₹1.45/kWh cross-subsidy surcharge.
Source: HERC GEOA amendment 2025; DHBVN circular D-06/2026Worked example
| Item | Value | Basis |
|---|---|---|
| System cost | ₹23,00,000 | 100 kW × ₹23,000/kW, ex-GST (Sun Wave reference) |
| Year-1 generation | 1,20,000 units | 100 kW × 1,200 kWh/kWp/year (Delhi Solar Policy, 2nd Amendment 2026) |
| Grid energy charge avoided | ₹6.95/kVAh | HT industrial energy charge at 11 kV, FY2026-27 (HERC FY2026-27 order (DHBVN circular D-06/2026)) |
| Year-1 saving | ≈ ₹8,34,000 | 1,20,000 × ₹6.95 |
| Simple payback | ≈ 2.8 years | System cost ÷ year-1 saving |
Illustrative only. Assumes the factory uses all solar output during working hours and counts the energy charge alone, treating one kVAh as one kWh (unity power factor). It excludes GST, demand charges, surcharges, panel degradation, O&M and financing. Your actual payback depends on your tariff category, load profile and roof. Try the solar savings calculator with your own bill.
Local context
In March 2026 the IMT Udyog Welfare Association, Rohtak said a sharp rise in fixed charges on electricity bills had placed a heavy financial burden on industrialists.
Source: The Tribune, Mar 2026HSIIDC's environmental filing for IMT Rohtak Phase III projects 75.44 MW (94.3 MVA) of power demand and lists general manufacturing, automobile and mechanical units as intended occupants.
Source: HSIIDC filing, PariveshRohtak is in the National Capital Region, so CAQM Direction No. 76 applies: diesel DG sets may run only as backup, and older sets of 41–800 kW need dual-fuel kits or certified emission-control retrofits. Rooftop solar cuts the daytime units a DG set or the grid has to supply.
Source: CAQM Direction No. 76 (as amended 2024)IMT Rohtak and Rohtak's other industrial areas are served by UHBVN's Rohtak operation circle. Net-metering applications are filed on UHBVN's portal, solarconnection.uhbvn.org.in.
HERC rules require UHBVN to check technical feasibility within 15 days of acknowledging a complete application and to issue a Letter of Approval within 22 days. You then have 180 days to install the plant.
No. Solar reduces the energy units you buy, at ₹6.95/kVAh for 11 kV HT supply, but the ₹290/kVA/month contract-demand charge stays. The saving comes from avoided energy charges and reduced DG running.
Sun Wave's reference price is ₹23,000/kW excluding GST at 100 kW, about ₹23 lakh, and ₹22,000/kW at 500 kW, about ₹1.1 crore. The final price follows a site survey.
Two quick steps — most of it is just tapping. Our engineers come back within 24 hours with a custom design and savings estimate.
Whether you run a factory, warehouse, or commercial facility - we have the perfect solar solution. Our team will design a system tailored to your energy needs and budget.