Perovskite-Silicon Tandem Solar Cells Hit 2026 Records
2026 lab records pushed perovskite-silicon tandem solar cells past 32% certified efficiency. Here's what the research says, and why C&I buyers in India shouldn't wait for it.
Sun Wave Knowledge Centre
Guides, case studies, and industry updates to help you make informed decisions about solar energy for your business.
2026 lab records pushed perovskite-silicon tandem solar cells past 32% certified efficiency. Here's what the research says, and why C&I buyers in India shouldn't wait for it.
RRECL's draft SOP requires 2-hour BESS at 5% of capacity for Rajasthan renewable projects above 5 MW. Here is who it affects and what compliance requires.
India's 2026 inverter shake-up: MNRE's data-localisation mandate, CEA's AI islanding test, SiC/GaN efficiency gains, and the Khavda outage pushing grid-forming inverters into new BESS rules.
UPERC repealed its 2022 captive verification rules to align with central Electricity (Amendment) Rules, 2026. Here is what changed for UP captive and group-captive solar.
MNRE's 18 July 2026 OM lets net-metering and open-access solar projects commission with non-ALMM-II cells until 31 December 2026. What C&I buyers must do before the deadline.
CEA's 2026 BESS safety standards, VGF status, the proposed ALBM battery list and Rajasthan's behind-the-meter BESS rules for C&I solar-plus-storage buyers.
Haryana open access solar FY2026-27: wheeling ₹0.73, CSS ₹1.45, surcharge ₹1.37/unit. Full charge stack, worked landed cost example, group captive exemptions, banking rules. Verified Oct 2026.
Open-access and captive users face a 35.95% Renewable Consumption Obligation in FY2026-27, with a distributed RE carve-out. Shortfall reports due 31 Dec 2026.
NPCL rooftop solar for Greater Noida factories: UPERC net billing (not net metering), 2 MW cap, Solar Injection Compensation, fees and FY 2026-27 tariffs.
RERC DREGS 2021 net metering/net billing for Rajasthan factories: 1 MW cap, 100% sanctioned load, 80% DT rule, export settlement and the 2025 VNM/GNM amendment.
115BAA keeps the 40% solar accelerated depreciation but drops the 20% additional depreciation. Old regime vs 22% regime worked example on a ₹1 Cr plant.
Delhi C&I rooftop solar: DERC net metering (July 2026 rules), ₹1/kWh GBI for C&I, group/virtual net metering, green open access at 100 kW, and realistic ROI.