100 kW reference
₹23,000/kW
≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop

CAPEX rooftop solar for IMT Manesar's auto-component, die-casting, electronics and garment plants. Large single-storey sheds and multi-shift loads make Manesar one of the best rooftop locations in the NCR.
100 kW reference
₹23,000/kW
≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop
500 kW reference
₹22,000/kW
≈ ₹1.1 crore ex-GST; scale lowers per-kW cost
Power distribution company
DHBVN
Dakshin Haryana Bijli Vitran Nigam (Manesar division)
Industrial areas covered
6 areas
IMT Manesar Phase I, IMT Manesar Phase II, IMT Manesar Phases III & IV
A 100 kW CAPEX rooftop system for a IMT Manesar factory costs about ₹23 lakh (₹23,000/kW) excluding GST with Sun Wave, and a 500 kW system about ₹1.1 crore (₹22,000/kW). Sizes in between are priced progressively, and the final quote follows a site survey of your roof, load and DHBVN connection.
Where we work
About 1,313 plots and 1,250 producing units (2015-16 district profile).
About 160 plots and 150 producing units (2015-16 district profile).
About 632 plots and 610 producing units (2015-16 district profile).
Served by a new HSIIDC 66/11 kV substation started in 2026.
HSIIDC technology park of about 466 acres.
Core IMT sectors on the new Sector 8 substation's supply plan.
Who we build for
Tier-1 and tier-2 suppliers run long daytime shifts that use solar output on site.
Heavy machining and auxiliaries make the energy charge a large share of cost.
Assembly lines and HVAC loads run steadily through solar hours.
Garment exporters in IMT sectors run large sheds suited to rooftop arrays.
Continuous chilling and packing loads pair well with daytime generation.
Grid rules
Under HERC's 2021 rooftop regulations, net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower. Larger plants can use gross metering up to contract demand. Consumers drawing open-access power cannot also net-meter.
Source: HERC Rooftop Solar Regulations 2021Since HERC's 2nd Amendment (October 2025), surplus credits carry forward within a 1 October – 30 September settlement period. Credits left at the end are bought by the DISCOM at 90% of the feed-in tariff, so size the plant for daytime self-consumption.
Source: HERC 2nd Amendment, DHBVN circular D-23/2025HT industrial supply (above 50 kW) pays ₹6.95/kVAh at 11 kV and ₹6.85/kVAh at 33 kV, plus ₹290/kVA/month of contract demand. Electricity duty, municipal tax and FSA are extra. There is no solar-hour rebate in the FY2026-27 schedule.
Source: HERC tariff order 25 Mar 2026 (DHBVN circular D-06/2026)Applications go through DHBVN's online solar portal (esolarconn.dhbvn.org.in) with a ₹1,000 fee. HERC rules require a technical-feasibility decision within 15 days and a Letter of Approval within 22 days of acknowledgement; the plant must then be installed within 180 days.
Source: HERC Rooftop Solar Regulations 2021Consumers with 100 kW or more of contract demand can buy green power through open access; since 2025 several connections in the same operation division can be clubbed to reach 100 kW. FY2026-27 HT charges include ₹0.73/kWh wheeling and ₹1.45/kWh cross-subsidy surcharge.
Source: HERC GEOA amendment 2025; DHBVN circular D-06/2026Worked example
| Item | Value | Basis |
|---|---|---|
| System cost | ₹23,00,000 | 100 kW × ₹23,000/kW, ex-GST (Sun Wave reference) |
| Year-1 generation | 1,20,000 units | 100 kW × 1,200 kWh/kWp/year (Delhi Solar Policy, 2nd Amendment 2026) |
| Grid energy charge avoided | ₹6.95/kVAh | HT industrial energy charge at 11 kV, FY2026-27 (DHBVN circular D-06/2026) |
| Year-1 saving | ≈ ₹8,34,000 | 1,20,000 × ₹6.95 |
| Simple payback | ≈ 2.8 years | System cost ÷ year-1 saving |
Illustrative only. Assumes the factory uses all solar output during working hours and counts the energy charge alone, treating one kVAh as one kWh (unity power factor). It excludes GST, demand charges, surcharges, panel degradation, O&M and financing. Your actual payback depends on your tariff category, load profile and roof. Try the solar savings calculator with your own bill.
Local context
HSIIDC began a ₹28 crore 66/11 kV substation in IMT Sector 8 in 2026 to supply sectors 1, 2, 3, 4 and 8, aiming to end the outages, voltage swings and tripping that pushed units onto DG sets.
Source: The Tribune, 2026In March 2026, with gas supply uncertain, the Manesar industry association asked HSPCB for temporary permission to switch back to diesel — a sign of how exposed heat-process units are to fuel shocks.
Source: Times of India, Mar 2026Industry delegations reported continuing 11 kV breakdowns and tripping in the Manesar sub-division and a shortage of maintenance staff at night (March 2026).
Source: Live Hindustan, Mar 2026Manesar, in Gurugram district, is in the National Capital Region, so CAQM Direction No. 76 applies: diesel DG sets may run only as backup, and older sets of 41–800 kW need dual-fuel kits or certified emission-control retrofits. Rooftop solar cuts the daytime units a DG set or the grid has to supply.
Source: CAQM Direction No. 76 (as amended 2024)Yes. Manesar is a DHBVN division in Gurugram district, so net metering follows HERC's 2021 rooftop regulations. Applications go through DHBVN's online solar portal with a ₹1,000 fee.
Surplus units carry forward as credits within a 1 October – 30 September settlement period. Credits left at the end are bought by DHBVN at 90% of the feed-in tariff, so sizing the plant to daytime self-consumption gives the best value.
Sun Wave's reference price is ₹22,000/kW excluding GST at 500 kW, about ₹1.1 crore, and ₹23,000/kW at 100 kW. The final price follows a site survey. 500 kW is also the HERC net-metering ceiling if your contract demand is at least that high.
Industry bodies have reported 11 kV breakdowns, tripping and night-time staff shortages in Manesar, and gas supply uncertainty in 2026 added pressure. HSIIDC's new Sector 8 substation is meant to stabilise supply, while rooftop solar reduces daytime grid and DG units.
Two quick steps — most of it is just tapping. Our engineers come back within 24 hours with a custom design and savings estimate.
Whether you run a factory, warehouse, or commercial facility - we have the perfect solar solution. Our team will design a system tailored to your energy needs and budget.