100 kW reference
₹23,000/kW
≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop

CAPEX rooftop solar for Gurugram's factories, from Udyog Vihar's garment and auto-component units to the Sector 37 and Bilaspur belts. Our Faridabad team designs to DHBVN's rules and your daytime load.
100 kW reference
₹23,000/kW
≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop
500 kW reference
₹22,000/kW
≈ ₹1.1 crore ex-GST; scale lowers per-kW cost
Power distribution company
DHBVN
Dakshin Haryana Bijli Vitran Nigam (Gurugram-I & II circles)
Industrial areas covered
6 areas
Udyog Vihar Phases I–VI & Sector 18, Udyog Vihar Sector 37 / Khandsa, Sectors 34–35 (HSIIDC)
A 100 kW CAPEX rooftop system for a Gurugram factory costs about ₹23 lakh (₹23,000/kW) excluding GST with Sun Wave, and a 500 kW system about ₹1.1 crore (₹22,000/kW). Sizes in between are priced progressively, and the final quote follows a site survey of your roof, load and DHBVN connection.
Where we work
HSIIDC estate of about 2,140 plots and 2,068 producing units (2015-16 district profile).
Home to the state's Auto Components and Apparel cluster facilities.
About 131 plots and 125 producing units (2015-16 district profile).
Light-engineering cluster with a state common facility centre.
Industrial belt where 11 kV feeder outages drove DG use in 2026.
Informal industrial pockets with many small engineering and garment units.
Who we build for
The Gurugram–Manesar–Bawal belt is India's auto hub; multi-shift loads absorb daytime solar fully.
Export apparel units run cutting, stitching and finishing through the working day.
Machine shops and moulding lines in Basai run day-shift loads that match solar output.
Electroplating is power-intensive, so each avoided grid unit saves more.
Grid rules
Under HERC's 2021 rooftop regulations, net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower. Larger plants can use gross metering up to contract demand. Consumers drawing open-access power cannot also net-meter.
Source: HERC Rooftop Solar Regulations 2021Since HERC's 2nd Amendment (October 2025), surplus credits carry forward within a 1 October – 30 September settlement period. Credits left at the end are bought by the DISCOM at 90% of the feed-in tariff, so size the plant for daytime self-consumption.
Source: HERC 2nd Amendment, DHBVN circular D-23/2025HT industrial supply (above 50 kW) pays ₹6.95/kVAh at 11 kV and ₹6.85/kVAh at 33 kV, plus ₹290/kVA/month of contract demand. Electricity duty, municipal tax and FSA are extra. There is no solar-hour rebate in the FY2026-27 schedule.
Source: HERC tariff order 25 Mar 2026 (DHBVN circular D-06/2026)Applications go through DHBVN's online solar portal (esolarconn.dhbvn.org.in) with a ₹1,000 fee. HERC rules require a technical-feasibility decision within 15 days and a Letter of Approval within 22 days of acknowledgement; the plant must then be installed within 180 days.
Source: HERC Rooftop Solar Regulations 2021Consumers with 100 kW or more of contract demand can buy green power through open access; since 2025 several connections in the same operation division can be clubbed to reach 100 kW. FY2026-27 HT charges include ₹0.73/kWh wheeling and ₹1.45/kWh cross-subsidy surcharge.
Source: HERC GEOA amendment 2025; DHBVN circular D-06/2026Worked example
| Item | Value | Basis |
|---|---|---|
| System cost | ₹23,00,000 | 100 kW × ₹23,000/kW, ex-GST (Sun Wave reference) |
| Year-1 generation | 1,20,000 units | 100 kW × 1,200 kWh/kWp/year (Delhi Solar Policy, 2nd Amendment 2026) |
| Grid energy charge avoided | ₹6.95/kVAh | HT industrial energy charge at 11 kV, FY2026-27 (DHBVN circular D-06/2026) |
| Year-1 saving | ≈ ₹8,34,000 | 1,20,000 × ₹6.95 |
| Simple payback | ≈ 2.8 years | System cost ÷ year-1 saving |
Illustrative only. Assumes the factory uses all solar output during working hours and counts the energy charge alone, treating one kVAh as one kWh (unity power factor). It excludes GST, demand charges, surcharges, panel degradation, O&M and financing. Your actual payback depends on your tariff category, load profile and roof. Try the solar savings calculator with your own bill.
Local context
Haryana City Gas officials said only about 1,000 of roughly 17,000 Gurugram industrial units had a PNG connection (Oct 2025), which limits dual-fuel DG compliance and keeps many units on diesel.
Source: Hindustan Times, Oct 2025In March 2026 industry groups told DHBVN that 11 kV feeder outages in Bilaspur and Manesar and an overloaded 66 kV substation at Sohna were forcing units onto DG sets.
Source: Live Hindustan, Mar 2026HERC granted a parallel distribution licence for Gurugram and Nuh on 19 Oct 2026, then halted it on 28 Oct 2026 after a state direction. DHBVN remains the only operating licensee.
Source: Business Standard, 28 Oct 2026Gurugram is in the National Capital Region, so CAQM Direction No. 76 applies: diesel DG sets may run only as backup, and older sets of 41–800 kW need dual-fuel kits or certified emission-control retrofits. Rooftop solar cuts the daytime units a DG set or the grid has to supply.
Source: CAQM Direction No. 76 (as amended 2024)Gurugram is served by DHBVN under HERC's 2021 rooftop regulations. Net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower; larger plants can use gross metering up to contract demand, subject to feasibility.
For FY2026-27 the HT energy charge is ₹6.95/kVAh at 11 kV and ₹6.85/kVAh at 33 kV, plus ₹290/kVA/month of contract demand. Electricity duty, municipal tax and FSA are extra, so every solar unit used on site avoids at least the energy charge.
Sun Wave's reference price is ₹23,000/kW excluding GST at 100 kW, about ₹23 lakh, and ₹22,000/kW at 500 kW, about ₹1.1 crore. The final price is fixed after a site survey of the roof, load and DHBVN connection.
Across the NCR, older diesel sets must run dual-fuel or with a certified emission-control retrofit, while CPCB-IV+ sets up to 800 kW and gas gensets are unrestricted. DG sets are meant for backup only, and rooftop solar cuts the daytime hours they or the grid must cover.
Two quick steps — most of it is just tapping. Our engineers come back within 24 hours with a custom design and savings estimate.
Whether you run a factory, warehouse, or commercial facility - we have the perfect solar solution. Our team will design a system tailored to your energy needs and budget.