Industrial rooftop solar for factories in Bahadurgarh
UHBVN area · Jhajjar, Haryana

Bahadurgarh factory solar: 100 kW at ₹23,000/kW

CAPEX rooftop solar for the Modern Industrial Estate, the Sector 17 Footwear Park and Bahadurgarh's other estates. Bahadurgarh is served by UHBVN, so net metering runs through UHBVN's portal.

100 kW reference

₹23,000/kW

≈ ₹23 lakh ex-GST for a qualifying CAPEX rooftop

500 kW reference

₹22,000/kW

≈ ₹1.1 crore ex-GST; scale lowers per-kW cost

Power distribution company

UHBVN

Uttar Haryana Bijli Vitran Nigam (Jhajjar circle, Bahadurgarh division)

Industrial areas covered

5 areas

Modern Industrial Estate (MIE) Parts I & II, HSIIDC Sector 17 Footwear Park, HSIIDC Industrial Estate, Sector 16

How much does factory rooftop solar cost in Bahadurgarh?

A 100 kW CAPEX rooftop system for a Bahadurgarh factory costs about ₹23 lakh (₹23,000/kW) excluding GST with Sun Wave, and a 500 kW system about ₹1.1 crore (₹22,000/kW). Sizes in between are priced progressively, and the final quote follows a site survey of your roof, load and UHBVN connection.

Where we work

Industrial areas we cover in Bahadurgarh

Modern Industrial Estate (MIE) Parts I & II

About 2,322 plots on 497 acres, around 1,500 producing units (district profile).

HSIIDC Sector 17 Footwear Park

About 300 acres with 368 units, now at capacity.

HSIIDC Industrial Estate, Sector 16

General-industry estate next to the Footwear Park.

HSIIDC Sector 4B

About 26 plots on 177 acres (district profile).

Old Government Industrial Area

About 85 plots on 107 acres (district profile).

Who we build for

Bahadurgarh industries that suit rooftop solar

Non-leather footwear

About 2,500 units making over 60% of India's non-leather footwear; day-shift cutting and stitching.

Steel tubes, CR strips & wire

Rolling and drawing are power-intensive daytime processes.

Ceramics, glass & sanitaryware

Large sheds and heavy electrical auxiliaries.

Plastics, rubber & chemicals

Moulding loads run through solar hours.

Grid rules

UHBVN and Haryana rules for factory solar

Net metering up to 500 kW

Under HERC's 2021 rooftop regulations, net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower. Larger plants can use gross metering up to contract demand. Consumers drawing open-access power cannot also net-meter.

Source: HERC Rooftop Solar Regulations 2021

How surplus units are settled

Since HERC's 2nd Amendment (October 2025), surplus credits carry forward within a 1 October – 30 September settlement period. Credits left at the end are bought by the DISCOM at 90% of the feed-in tariff, so size the plant for daytime self-consumption.

Source: HERC 2nd Amendment, DHBVN circular D-23/2025

FY2026-27 industrial tariff

HT industrial supply (above 50 kW) pays ₹6.95/kVAh at 11 kV and ₹6.85/kVAh at 33 kV, plus ₹290/kVA/month of contract demand. Electricity duty, municipal tax and FSA are extra. There is no solar-hour rebate in the FY2026-27 schedule.

Source: HERC tariff order 25 Mar 2026 (DHBVN circular D-06/2026)

Applying to UHBVN

UHBVN runs its own rooftop portal (solarconnection.uhbvn.org.in). HERC rules require feasibility within 15 days and a Letter of Approval within 22 days; plants above 20 kWp also need a safety certificate from the Chief Electrical Inspector before commissioning.

Source: UHBVN rooftop solar FAQ

Green open access from 100 kW

Consumers with 100 kW or more of contract demand can buy green power through open access; since 2025 several connections in the same operation division can be clubbed to reach 100 kW. FY2026-27 HT charges include ₹0.73/kWh wheeling and ₹1.45/kWh cross-subsidy surcharge.

Source: HERC GEOA amendment 2025; DHBVN circular D-06/2026

Worked example

Payback on a 100 kW rooftop in Bahadurgarh

ItemValueBasis
System cost₹23,00,000100 kW × ₹23,000/kW, ex-GST (Sun Wave reference)
Year-1 generation1,20,000 units100 kW × 1,200 kWh/kWp/year (Delhi Solar Policy, 2nd Amendment 2026)
Grid energy charge avoided₹6.95/kVAhHT industrial energy charge at 11 kV, FY2026-27 (HERC FY2026-27 order (DHBVN circular D-06/2026))
Year-1 saving≈ ₹8,34,0001,20,000 × ₹6.95
Simple payback≈ 2.8 yearsSystem cost ÷ year-1 saving

Illustrative only. Assumes the factory uses all solar output during working hours and counts the energy charge alone, treating one kVAh as one kWh (unity power factor). It excludes GST, demand charges, surcharges, panel degradation, O&M and financing. Your actual payback depends on your tariff category, load profile and roof. Try the solar savings calculator with your own bill.

Local context

What Bahadurgarh factories should know

Bahadurgarh is served by UHBVN — its Jhajjar operation circle has a dedicated XEN Bahadurgarh division — so applications go to UHBVN's portal, not DHBVN's.

Source: UHBVN Jhajjar contact directory

Footwear industrialists named steep electricity tariffs as a major challenge alongside GST and labour shortages (July 2025), and the Footwear Park is full, so existing roofs are the main space for new energy capacity.

Source: The Tribune, Jul 2025

The local chamber says Bahadurgarh has over 9,000 industrial units; in March 2026 a cap on daily PNG supply, with over-drawal billed at higher rates, showed units' exposure to fuel-cost shocks.

Source: The Tribune, Mar 2026

Bahadurgarh (Jhajjar district) is in the National Capital Region, so CAQM Direction No. 76 applies: diesel DG sets may run only as backup, and older sets of 41–800 kW need dual-fuel kits or certified emission-control retrofits. Rooftop solar cuts the daytime units a DG set or the grid has to supply.

Source: CAQM Direction No. 76 (as amended 2024)

Frequently Asked Questions

Is Bahadurgarh under UHBVN or DHBVN for solar net metering?

UHBVN. Bahadurgarh falls under UHBVN's Jhajjar operation circle, which has its own XEN Bahadurgarh division. File the application on UHBVN's portal, solarconnection.uhbvn.org.in, not the DHBVN portal.

Does rooftop solar suit a footwear factory in Bahadurgarh?

Yes, usually. Footwear units mostly run daytime cutting, stitching and moulding, which matches solar generation, so most output is used on site. Sun Wave's reference price is ₹23,000/kW at 100 kW and ₹22,000/kW at 500 kW, excluding GST and final after a site survey.

What is the net-metering limit for a factory in MIE Bahadurgarh?

Under HERC's 2021 regulations, net metering is allowed up to 500 kW or your sanctioned load / contract demand, whichever is lower. The plant also cannot exceed sanctioned load (LT) or contract demand (HT).

What are the DG set rules for Bahadurgarh factories?

Jhajjar district is in the NCR, so CAQM Direction 76 allows DG sets only as backup. Older diesel sets must run dual-fuel or with certified emission-control retrofits unless they meet the CPCB-IV+ standard up to 800 kW or run on gas.

Bahadurgarh solar guides

Nearby industrial locations

Get Your Free Quote

Two quick steps — most of it is just tapping. Our engineers come back within 24 hours with a custom design and savings estimate.

Your requirementStep 1 of 2
What kind of facility is it?
Monthly electricity bill

A rough range is fine — it sizes the system.

How would you like to pay for it?

Not sure is a perfectly good answer — we'll advise.

All optional.

Let's Power Your Business

Whether you run a factory, warehouse, or commercial facility - we have the perfect solar solution. Our team will design a system tailored to your energy needs and budget.

Phone
+91-8800477880
Email
shubham@sunwavetech.com
Address
Plot no. 10/11, Napco Bevel Gear, Faridabad, Haryana 121005
Working Hours
Mon-Sat: 9:00 AM - 6:00 PM