How much does a 250 kW solar plant cost in India?

A 250 kW rooftop solar plant costs about ₹55.6 lakh ex-GST at an interpolated C&I reference rate of ₹22,250/kW, and roughly ₹60.6 lakh once the ~8.9% effective GST on a turnkey EPC supply is added. The final price follows the site survey — roof structure, evacuation cabling and switching scope move it in either direction.

TL;DR: Budget roughly ₹55–57 lakh ex-GST (≈₹60–62 lakh with GST) for a 250 kW industrial rooftop CAPEX plant. In North India it generates about 3.75–4.0 lakh units a year, needs 20,000–25,000 sq ft of roof, and — at a ₹7–10/unit tariff with high daytime self-consumption — pays back in roughly 2–4 years. There is no subsidy for C&I plants: PM Surya Ghar is residential-only.

Last verified: 17 November 2026

Contents

How the cost figure is derived

Sun Wave publishes two C&I rooftop CAPEX reference rates: ₹23,000/kW at the 100 kW scale and ₹22,000/kW at the 500 kW scale, both ex-GST and subject to a site survey (see Sun Wave's industrial solar page). A 250 kW plant sits between the two published points, so the planning figure here is a straight-line interpolation between them — labelled as such, not a quotation:

StepArithmeticResult
100 kW reference total100 kW × ₹23,000/kW₹23.00 lakh
500 kW reference total500 kW × ₹22,000/kW₹110.00 lakh
Interpolated total at 250 kW₹23.0 L + (250 − 100) ÷ (500 − 100) × (₹110.0 L − ₹23.0 L)≈ ₹55.6 lakh
Implied rate₹55.6 lakh ÷ 250 kW≈ ₹22,250/kW

Interpolating the per-kW rate instead — ₹23,000 − (150 ÷ 400) × ₹1,000 = ₹22,625/kW — lands about ₹1 lakh higher, at ₹56.6 lakh. Real quotes at this size will fall inside that span, so a planning band of ≈ ₹55–57 lakh ex-GST (≈ ₹60–62 lakh with GST) is the honest answer. For orientation at neighbouring sizes: a 100 kW plant runs ≈ ₹23 lakh ex-GST, a 500 kW plant ≈ ₹1.10 crore and a 1 MW plant ≈ ₹2.2 crore — see the 100 kW, 500 kW and 1 MW cost guides.

GST on a 250 kW rooftop solar plant

Since 22 September 2025, GST on solar modules and renewable-energy devices is 5% (down from 12%), under Notification 9/2025-Central Tax (Rate) dated 17 September 2025. For a composite EPC supply, the 70:30 convention applies — 70% of the gross value is treated as goods (5% GST) and 30% as services (18% GST), making the effective rate ≈ 8.9%, the same arithmetic the CERC order walks through.

On a ₹55.6 lakh ex-GST contract:

  • GST ≈ ₹55.6 L × 8.9% ≈ ₹4.9 lakh
  • Indicative turnkey outflow ≈ ₹60.6 lakh

Two caveats matter. First, GST input tax credit on a solar plant is conditional — eligibility depends on the entity's own taxable turnover and use, so treat credit as a tax question for your CA, not a given (see our GST and ITC guide for factories). Second, electricity sales and PPA tariffs carry no GST (exempt), so an OPEX/PPA route avoids the GST outflow question entirely.

How much power does 250 kW generate?

In Delhi-NCR, Haryana and Rajasthan, a well-designed rooftop plant produces 1,500–1,600 units per kW per year (4.0–4.5 units/kW/day averaged across the year) — see our city-wise generation norms. A 250 kW plant therefore generates:

  • ~3.75–4.0 lakh units a year
  • Roughly 1,000–1,100 units a day averaged across the year, peaking above 1,300 in May and dipping near 750–800 in December

The value of those units depends on how much you self-consume. A plant exporting most of its output to the grid earns the much lower APPC/banking rate, so sizing to daytime load is what protects ROI — see how to size a solar plant for a factory.

How much roof area does 250 kW need?

Plan on 80–100 sq ft per kW, i.e. 20,000–25,000 sq ft of usable, shade-free roof — roughly half an acre of built-up area (see our area-per-kW guide). A structural load assessment should precede any pricing, since reinforcement or a phased layout is the most common cost surprise at this size — see our roof structural load assessment guide. Where roof area falls short, elevated structures or a partial ground-mount can complete the capacity — see our carport vs ground-mount comparison.

Savings and payback: worked example

Assumptions (stated so you can swap in your own numbers): ₹8/unit grid tariff, 90% daytime self-consumption, generation of 1,500 units/kW/year, O&M at ₹500–800/kW/year.

StepArithmeticResult
Annual generation250 kW × 1,500 units3.75 lakh units
Self-consumed units3.75 lakh × 90%3.375 lakh units
Annual bill savings3.375 lakh × ₹8₹27.0 lakh
Less O&M250 kW × ₹500–800₹1.25–2.0 lakh
Net annual benefit₹27.0 L − ₹1.25–2.0 L≈ ₹25.0–25.8 lakh
Turnkey capex incl. GST₹55.6 L × 1.089≈ ₹60.6 lakh
Simple payback₹60.6 L ÷ ≈ ₹25.4 L≈ 2.4 years

Across a ₹7–10/unit tariff band and 85–95% self-consumption, simple payback lands in the 2–4 year range, before financing costs and accelerated depreciation. If your load is a poor daytime match or your tariff is below ₹6/unit, run the numbers the other way first — the payback and ROI guide shows the sensitivity, and the IRR methodology guide covers the financing layer. To sense-check the tariff against your own bill, see how to read an industrial electricity bill.

Tax benefits: accelerated depreciation and GST credit

For a CAPEX buyer, two tax levers typically shorten the effective payback:

Both depend on your tax position — model them with your CA before committing to a structure.

Is there a subsidy for a 250 kW plant?

No. The PM Surya Ghar central financial assistance applies to residential consumers and to group housing societies/RWAs for common facilities — not to commercial or industrial plants (PIB scheme annexure). Any quote that implies a C&I subsidy is misstating the scheme; see commercial solar subsidy realities.

CAPEX vs RESCO and PPA at 250 kW

At 250 kW, all three commercial models are workable: outright CAPEX (fastest payback, keeps the depreciation benefit), a RESCO/OPEX PPA (no capex, pay per unit, but PPA tariffs carry a developer margin), or group-captive open access where load and roof do not match. The trade-offs are compared in our CAPEX vs OPEX vs open access guide and the RESCO/OPEX model guide. Note that PPA and open-access routes change the economics in ways the CAPEX-frame worked example above does not capture — model each on its own tariff basis.

When is 250 kW the right size?

250 kW is a common landing point for mid-size factories, cold stores and process units whose daytime load can absorb roughly 1,000–1,100 units a day. It is also the midpoint of the price ladder this series covers — see the 50 kW, 100 kW, 500 kW and 1 MW guides for neighbouring sizes.

How the project comes together

The sequence is standard: structural and electrical assessment, sizing to load, discom application under the state's net metering rules (see our guides for Delhi, Haryana/DHBVN and UP/UPPCL), installation, statutory inspection and commissioning — see our CEIG guide and commissioning checklist. An experienced EPC sequences the work so production is not interrupted. Sun Wave's industrial solar team prices every 250 kW project after a site survey; the figures here are planning numbers, not a quotation.

Frequently Asked Questions

What is the cost of a 250 kW solar plant in India?

About ₹55.6 lakh ex-GST at the interpolated C&I reference rate of ₹22,250/kW, or ≈ ₹60.6 lakh with the ~8.9% effective GST on a turnkey EPC supply. Real quotes land in a ₹55–57 lakh ex-GST band and remain subject to site survey. No PM Surya Ghar subsidy applies to C&I plants.

How many units does a 250 kW solar plant generate per day?

Roughly 1,000–1,100 units a day averaged across the year in North India — about 3.75–4.0 lakh units a year at 1,500–1,600 units/kW — peaking above 1,300 units/day in May and dipping toward 750–800 in December.

How much roof area does a 250 kW solar plant need?

About 20,000–25,000 sq ft of usable, shade-free roof at the standard 80–100 sq ft per kW norm — roughly half an acre. On older sheds, structural load capacity, not area, is usually the binding constraint.

What is the payback period for a 250 kW solar plant?

Roughly 2–4 years for a CAPEX plant that self-consumes most of its output at a ₹7–10/unit tariff. The worked example above lands at about 2.4 years at ₹8/unit with 90% self-consumption, before financing costs; accelerated depreciation can shorten it further.

Is any subsidy available for a 250 kW commercial solar plant?

No. The PM Surya Ghar CFA is limited to residential consumers and RWAs/group housing societies for common facilities. Commercial and industrial plants get no capital subsidy; the tax levers are accelerated depreciation and conditional GST input credit.

Should the 250 kW plant be sized to roof area or to load?

To load. Across North Indian states, exported units earn far less than the grid tariff, so the plant should be sized to the daytime baseload; roof area and sanctioned load then cap what is possible — see how to size a solar plant for a factory.

Ready to Go Solar?

Get a free consultation and custom quote for your industrial or commercial facility. Start saving on energy costs today.

Get Free Quote