How much does a 50 kW solar system cost in India?
A 50 kW commercial rooftop solar system has no single list price, but the most honest planning benchmark comes from Sun Wave Technologies' published C&I reference rate: ₹23,000 per kW ex-GST at 100 kW (about ₹23 lakh), which scales to roughly ₹11.5 lakh ex-GST at 50 kW. Sun Wave does not publish a 50 kW rate, and plants smaller than 100 kW usually carry a higher price per kW because fixed engineering, approval and installation costs spread across fewer kilowatts — so treat ₹11.5 lakh as a floor benchmark, not a quote. The final price follows the site survey and engineering scope. Against typical North-India commercial tariffs of ₹7-10 per unit, that plant generates about 70,000-75,000 units a year, saves ₹5-7 lakh annually, and pays back in roughly 2-4 years for a tax-paying business.
TL;DR: 50 kW benchmark ₹11.5 lakh ex-GST (scaled from Sun Wave's ₹23,000/kW 100 kW reference rate) | 70,000-75,000 units/year | ₹5-7 lakh annual savings at ₹7-10/unit | payback ~2-4 years with 40% accelerated depreciation | no PM Surya Ghar subsidy for commercial systems | final price follows site survey.
Last verified: 16 November 2026
50 kW is the classic first solar project for small and mid-size businesses: petrol pumps, cold rooms, rice mills, schools, clinics, mid-size factories and workshops with daytime loads between roughly 200 and 300 units a day. It sits below the HT (high-tension) threshold in most North-Indian DISCOMs, so most 50 kW plants connect on a standard LT industrial or commercial connection. This guide covers what a 50 kW system costs, what it generates, how the payback works, and what the approval process looks like. For smaller and larger sizes, see the 10 kW solar system price guide and the 100 kW solar system cost guide.
Contents
- How much does a 50 kW solar system cost in India?
- What a 50 kW system generates and saves
- Worked example: 50 kW on an LT industrial connection
- What changes the price of a 50 kW plant
- Net metering, approvals and subsidy for 50 kW
- 50 kW or 100 kW: choosing the right size
- Frequently Asked Questions
What a 50 kW system generates and saves
Generation is the number every other figure depends on. A 50 kW rooftop system in North India typically produces 4-4.5 units per kW per day averaged over the year — about 190-200 units a day, or 70,000-75,000 units a year. City-level yields and the reasoning are in our solar units generated per kW guide for North Indian cities.
| Metric | Typical value (North India, 50 kW) |
|---|---|
| Specific yield | 1,400-1,500 kWh per kW per year |
| Annual generation | 70,000-75,000 units |
| Daily generation (annual average) | 190-200 units |
| Day-shift self-consumption achievable | 85-95% |
| Grid tariff replaced | ₹7-10 per unit (commercial/industrial LT) |
| Annual bill savings | ₹5-7 lakh |
Two levers decide where you land in that savings range. First, your tariff: a plant offsetting ₹9 per unit power earns roughly a third more than one offsetting ₹7. Second, self-consumption: units used on-site replace grid power at the full tariff, while exported units earn only the DISCOM's net-metering credit, which is much lower (for example, Uttarakhand pays ₹2 per surplus unit — see the worked example below). A business with a strong daytime load — cold storage, machining, processing, pumping — captures the full value.
Worked example: 50 kW on an LT industrial connection
Assumptions, all stated: a 50 kW plant in Uttarakhand on an UPCL LT industrial connection (RTS-5, contracted load up to 75 kW), specific yield of 1,450 kWh per kW per year, and 90% self-consumption. UPCL's FY 2026-27 tariff order sets the LT industrial energy charge at ₹5.75 per kVAh during normal hours, with a solar-hours rate of ₹4.46 and a peak rate of ₹7.48, and demand charges of ₹185 per kVA per month (UERC press note, 31 March 2026).
| Item | Value | Working |
|---|---|---|
| Annual generation | 72,500 units | 50 kW x 1,450 kWh/kW |
| Self-consumed (90%) | 65,250 units | replaces grid power |
| Savings from self-consumption | about ₹3.75 lakh | 65,250 x ₹5.75/kVAh |
| Export (10%) | 7,250 units | net-metered surplus |
| Export credit | about ₹14,500 | 7,250 x ₹2.00/kWh (UERC generic tariff) |
| Total year-1 benefit | about ₹3.9 lakh |
Cost and payback: at Sun Wave's 100 kW reference rate of ₹23,000/kW ex-GST, 50 kW scales to about ₹11.5 lakh ex-GST (a higher per-kW quote is normal at this size; treat it as a benchmark). Simple payback is about ₹11.5 lakh divided by ₹3.9 lakh, or roughly 3 years. A tax-paying business claiming 40% accelerated depreciation in year 1 (see our accelerated depreciation guide) recovers roughly ₹2.9 lakh of tax at a 25% rate, cutting the effective investment to about ₹8.6 lakh and payback to roughly 2.2-2.5 years. These are planning figures, not guarantees — your tariff, load profile and tax position move the result. For comparison at the next size up, the 100 kW worked example lands at a similar payback on a ₹23 lakh investment.
What changes the price of a 50 kW plant
| Factor | Direction and why |
|---|---|
| Roof type | RCC roofs need more structure and drilling time; metal-sheet (tin shed) roofs are cheaper per kW |
| Structure class | Hot-dip galvanised steel costs more than painted MS but lasts the plant's life |
| Cable distance | A long DC/AC run to the LT panel adds copper and voltage-drop losses |
| Roof strengthening | If the structural assessment calls for it, this is quoted separately after the survey |
| Metering upgrades | Some connections need a new bi-directional or CT-operated meter; DISCOM-specific charges apply |
| Inverter class | Tier-1 string inverters with longer warranties cost more upfront and less over 25 years |
A structural check is worth doing before you compare quotes — our roof structural load assessment guide explains what engineers look for. And when quotes arrive, judge them like-for-like: our EPC quote reading guide lists the line items a genuine turnkey quote must carry.
Net metering, approvals and subsidy for 50 kW
Three things to know before you commit:
- Net metering is available at 50 kW, with DISCOM-specific caps and process. In most states a 50 kW rooftop connects on net metering on an LT connection; capacity is usually allowed up to your sanctioned load, and a feasibility study is required above roughly 10 kW (in Uttarakhand, systems up to 10 kW are deemed accepted without one — see the UPCL net metering guide). Budget for a bi-directional meter, CEIG/EFI inspection where applicable, and DISCOM liaison time.
- No subsidy. PM Surya Ghar central financial assistance is for residential consumers, RWA/GHS and group housing societies only — commercial and industrial systems do not qualify (MNRE PM Surya Ghar guidelines). The tax benefits — 40% accelerated depreciation and GST input credit on eligible supplies — are the commercial equivalent.
- GST is part of the quote, not hidden in it. Solar modules attract 5% GST post-September 2025, and a turnkey contract settles at a blended rate on the standard 70:30 supply/services split; GST-registered businesses generally recover it as input credit. Our solar EPC GST and ITC guide walks through the mechanics.
50 kW or 100 kW: choosing the right size
| 50 kW | 100 kW | |
|---|---|---|
| Benchmark cost (ex-GST) | about ₹11.5 lakh (scaled benchmark) | ₹23 lakh (published reference rate) |
| Annual generation | 70,000-75,000 units | 1.4-1.5 lakh units |
| Roof area needed | about 5,000-6,000 sq ft | 8,000-10,000 sq ft |
| Connection | LT industrial/commercial | LT or HT, DISCOM-dependent |
| Best fit | steady daytime load, single unit | larger plants, HT consumers, expansion plans |
If your load is growing, it is usually cheaper to oversize conduits, cable trays and structure now and add panels later. If your daytime load is below roughly 200 units a day, 50 kW is the right first plant and a second phase can follow. When you are ready to compare installers, start with our guide to choosing a solar EPC company, and if you are a factory in Delhi-NCR or Haryana you can see Sun Wave's C&I offer on the Faridabad industrial solar page.
Frequently Asked Questions
How much does a 50 kW solar system cost in India?
There is no list price, but scaling Sun Wave Technologies' published C&I reference rate of ₹23,000/kW ex-GST (at 100 kW) gives about ₹11.5 lakh ex-GST for 50 kW as a floor benchmark. Systems below 100 kW usually carry a higher price per kW because fixed costs spread over fewer kilowatts, and the final quote follows the site survey. The complete cost picture is in our 100 kW cost guide and commercial solar cost guide.
How many solar panels are needed for a 50 kW system?
With current 575-600 Wp TOPCon or mono PERC modules, a 50 kW system uses about 85-90 panels. Panel count depends on the module wattage you select; higher-wattage panels cut mounting and cabling cost per kW.
How much roof area does a 50 kW solar system need?
Plan on roughly 100 sq ft per kW, so about 5,000-6,000 sq ft of shadow-free roof. Flush mounting on a metal-sheet roof needs less area than tilted rows on an RCC roof, where rows must be spaced to avoid shading each other.
How much power does a 50 kW solar system generate per day?
In North India, about 190-200 units a day averaged over the year, or 70,000-75,000 units a year. Output peaks in March-June and dips in the monsoon; monthly variation is in our units per kW guide.
Is there a government subsidy for a 50 kW solar system?
No. PM Surya Ghar central financial assistance covers residential homes, RWA/GHS and group housing societies only — commercial and industrial systems do not qualify. Businesses instead use 40% accelerated depreciation, GST input credit on eligible supplies, and state industrial incentives where notified.
Can a 50 kW solar system run on an LT connection?
Yes. In most North-Indian DISCOMs a 50 kW plant connects on an LT industrial or commercial connection — for example, UPCL's LT industrial category covers contracted loads up to 75 kW, with net metering and a feasibility study above 10 kW. Check your DISCOM's current tariff order for the exact category and charges.
What payback can a business expect on a 50 kW solar system?
Roughly 2-4 years: about 3 years on simple payback at a ₹5.75-7 per unit tariff, and around 2-2.5 years for a tax-paying business that claims 40% accelerated depreciation in year 1. Savings grow with tariff escalation while the investment is fixed.