Direct answer
A 1 MW solar plant in India is priced by site survey on Sun Wave Technologies' CAPEX reference ladder: Rs 23,000 per kW at 100 kW and Rs 22,000 per kW at 500 kW for qualifying rooftop projects, with 1 MW-class rooftop projects priced progressively below the 500 kW rate once engineering scope is fixed. A 1 MW plant generates 14-17.5 lakh units a year depending on location, saves Rs 1.1-1.7 crore a year at industrial tariffs of Rs 8-10 per unit, and pays back in roughly 3-5 years for a tax-taking business once 40% accelerated depreciation is claimed. For grid-approval purposes, the CTUIL benchmark from 1 September 2026 is Rs 3.5 crore per MW.
TL;DR: Reference ladder Rs 23,000/kW at 100 kW, Rs 22,000/kW at 500 kW, 1 MW+ priced by survey | 14-17.5 lakh units/year | Rs 1.1-1.7 crore annual savings at Rs 8-10/unit | ~1 lakh units and Rs 9-14 lakh saved per month | payback ~3-5 years with accelerated depreciation | area: 4-5 acres ground or ~80,000 sq ft roof.
A 1 MW plant is the scale at which industrial solar stops being a bill-reduction measure and becomes a power asset: it covers the full daytime load of most two- and three-shift factories, opens open-access and group-captive options, and changes how your finance team models the investment. This guide covers what drives the cost, what the plant earns, and how the decision differs from a 100-500 kW rooftop project.
| Quick facts (2026) | Value |
|---|---|
| Sun Wave CAPEX reference (100 kW) | Rs 23,000/kW ex-GST |
| Sun Wave CAPEX reference (500 kW) | Rs 22,000/kW ex-GST |
| 1 MW rooftop | Priced by survey, progressively below the 500 kW rate |
| CTUIL grid-approval benchmark (from 1 Sep 2026) | Rs 3.5 crore per MW |
| Area required | 4-5 acres ground; ~80,000 sq ft roof |
| Annual generation | 14-17.5 lakh units |
| O&M | ~1-2% of capex per year |
| Payback (with 40% AD) | ~3-5 years |
How 1 MW pricing works on the reference ladder
Sun Wave's reference pricing is scale-based: Rs 23,000 per kW at 100 kW and Rs 22,000 per kW at 500 kW for qualifying CAPEX rooftop projects, ex-GST, with intermediate capacities priced progressively between the two points and larger rooftop projects quoted below the 500 kW rate after the site survey fixes the engineering scope. What moves a 1 MW quote off the ladder:
| Factor | Effect |
|---|---|
| Roof vs ground-mount | Ground-mount adds land development but simplifies structure; rooftop structure and roof-condition works are survey items |
| Electrical integration | HT-side connection, transformer, protection and metering scope |
| Structure class | Hot-dip galvanised steel vs lighter sections; wind-load rating for your zone |
| Module technology | TOPCon premium over Mono PERC — worth it when area is the constraint (module efficiency guide) |
| Approvals | CEIG approval for HT systems, DISCOM liaison, net-metering or open-access filing |
For the smaller size bands with fixed reference rates, see the 100 kW system cost guide and the commercial solar cost guide.
The CTUIL benchmark, explained
Effective 1 September 2026, grid-connectivity approvals use a benchmark of Rs 3.5 crore per MW for solar (Rs 6 crore/MW wind, Rs 0.80 crore/MWh BESS). This is a regulatory benchmark for financial-closure scrutiny, not a market price statement — quotes that sit far off benchmark levels get flagged in approval checks (SauRo Energy, Sep 2026).
Cost breakdown: where the money goes
A 2025 techno-economic study of a 1 MW Indian industrial plant split capex roughly as follows:
| Component | Share |
|---|---|
| Solar modules | 40-45% |
| Inverters and controls | 10-12% |
| Mounting structure + civil works | 8-10% |
| Cabling, protection, electricals | 5-8% |
| Installation and commissioning | 8-10% |
| Design, approvals, taxes, contingency | ~20-25% |
(Source: IJFMR techno-economic study, Aug 2025; component shares corroborated by Qbits Energy capex glossary, Jul 2026.) Apply these shares to your surveyed turnkey price to see where a rupee lands — and use them to compare quotes line by line. For module-level pricing, see our solar module price tracker and per-watt price guide.
1 MW solar plant income per month
Buyers searching for 1 MW economics usually frame it as monthly income. For a self-consuming industrial host, the plant's monthly "income" is the avoided grid purchase:
| Metric | Value (Delhi-NCR/UP belt) |
|---|---|
| Annual generation | 14.2-15.2 lakh units |
| Monthly generation (average) | ~1.2 lakh units |
| Monthly savings at Rs 8/unit | ~Rs 9.6 lakh |
| Monthly savings at Rs 9/unit | ~Rs 10.8 lakh |
| Monthly savings at Rs 10/unit | ~Rs 12 lakh |
Seasonality is real — summer months generate above average, monsoon months below — so model the year, not the peak month. If you sell power instead of self-consuming (RESCO host, group captive, or third-party sale), monthly income is the PPA rate times delivered units, net of wheeling and surcharges; see our RESCO/OPEX model guide and third-party sale vs group captive comparison.
Rooftop vs ground-mount at 1 MW
- Ground-mount: needs 4-5 acres (up to ~6 with single-axis trackers); land development and fencing are the added scope items.
- Rooftop: needs about 80,000 sq ft (7,400-7,500 sqm) of shade-free industrial roof; structure and roof-condition works govern the survey. Region context in our UP industrial solar guide.
Area norms in detail are in our rooftop area per kW/MW guide.
How much power does 1 MW produce?
At a capacity utilisation factor of 18-20%, 1 MW generates 15.7-17.5 lakh units per year nationally; in the Delhi-NCR/UP belt, realistic yields are 14.2-15.2 lakh units per MW per year (1,420-1,520 kWh per kWp). City-wise yields are tabulated in our units generated per kW guide for North India.
Payback, IRR and running costs
- Plain savings case: against industrial HT tariffs of Rs 7.95-10.50/kWh across North India, a 1 MW plant saving 14-15 lakh units a year recovers its cost in roughly 5-7 years before tax benefits.
- With tax depreciation: 40% Year-1 accelerated depreciation plus GST input credit compresses payback to ~3-5 years for tax-taking companies (methodology in our accelerated depreciation guide, AD vs 115BAA analysis, and IRR calculation methodology).
- O&M: budget ~1-2% of capex per year — cleaning cycles, monitoring, preventive electrical checks, and an inverter replacement reserve in later years. Details in our solar O&M guide and panel cleaning schedule guide.
Frequently Asked Questions
What is the cost of a 1 MW solar plant in India in 2026?
1 MW-class projects are priced by site survey on Sun Wave's CAPEX reference ladder — Rs 23,000/kW at 100 kW and Rs 22,000/kW at 500 kW for qualifying rooftop projects, with 1 MW rooftop projects quoted progressively below the 500 kW rate. The CTUIL grid-approval benchmark from 1 September 2026 is Rs 3.5 crore per MW.
How much is a 1 MW solar plant's income per month?
In the Delhi-NCR/UP belt a 1 MW plant generates about 1.2 lakh units a month on average — worth roughly Rs 9.6-12 lakh per month in avoided grid purchases at tariffs of Rs 8-10 per unit. If you sell the power under a PPA instead, monthly income is the PPA rate times delivered units, net of wheeling and surcharges.
How many acres does a 1 MW solar plant need?
4-5 acres for a ground-mounted plant (up to ~6 acres with trackers). On a roof, 1 MW needs about 80,000 sq ft of usable industrial roofing.
How many units does 1 MW generate per year?
15.7-17.5 lakh units nationally at 18-20% CUF; 14.2-15.2 lakh units in the Delhi-NCR/UP belt. Multiply by your HT tariff to estimate annual savings.
Is any subsidy available for a 1 MW industrial solar plant?
No central capital subsidy applies to commercial and industrial solar — PM Surya Ghar is residential-only. The tax-side benefits (40% accelerated depreciation, 5% GST on solar devices, input credit) do the work instead; see our commercial solar subsidy reality check.
What is the per-unit cost of solar at 1 MW scale?
Levelised cost of energy at 1 MW scale typically works out to Rs 2.5-2.8/kWh over 25 years against industrial HT tariffs of Rs 7.95-10.50/kWh across North India — the spread that drives the 3-5 year post-tax paybacks.
Should I build 1 MW on my roof or split across sites?
If a single roof holds 80,000+ sq ft of usable area and your daytime load absorbs the generation, one 1 MW plant is simplest. If roofs are scattered, multiple 100-500 kW plants each land on the reference ladder at Rs 22,000-23,000/kW and keep self-consumption high — see our multi-site procurement strategy guide.
Sources
- Sun Wave Technologies reference pricing for qualifying CAPEX rooftop projects — Faridabad industrial solar page (Rs 23,000/kW at 100 kW, Rs 22,000/kW at 500 kW, ex-GST, verified September 2026)
- CTUIL advisory on benchmark project costs for grid connectivity, effective 1 September 2026 — SauRo Energy coverage
- IJFMR techno-economic study of a 1 MW industrial solar plant, August 2025 — DOI
- Qbits Energy capex glossary, July 2026 — component share corroboration
- Income Tax Act Section 32(1)(iia) — accelerated depreciation provisions
Ready to Go Solar?
Get a free consultation and custom quote for your industrial or commercial facility. Start saving on energy costs today.
Get Free Quote