For most households that can arrange payment or a loan, the CAPEX route through the national portal is the better deal — you own the system, claim the PM Surya Ghar subsidy of up to ₹78,000 directly, and keep the full electricity savings for the system's life. Choose the RESCO or ULA route when you want zero upfront investment and are comfortable paying the developer or DISCOM for the solar power you consume (MNRE guidelines coverage).

TL;DR: PM Surya Ghar supports three delivery routes: CAPEX (you buy via the national portal and get the CFA, up to ₹78,000 for 3 kW), RESCO (a developer funds the plant; you pay per unit consumed) and ULA (your DISCOM installs on behalf of households). CAPEX maximises lifetime savings and suits most homes with a bank connection; RESCO/ULA remove the upfront cost entirely and are being used to reach PMAY, BPL and SC/ST households. Societies get a separate ₹18,000/kW CFA for common facilities up to 500 kW.

Last verified: 18 November 2026

Contents:

What the RESCO, ULA and CAPEX routes mean

PM Surya Ghar began as a consumer-driven scheme: households apply on the national portal, pick a registered vendor, pay for the system and receive the central financial assistance (CFA) themselves. MNRE's January 2025 guidelines added two alternative models that complement the portal route (Energy Watch):

  • CAPEX (consumer-driven): you finance and own the rooftop plant, applied for through pmsuryaghar.gov.in. This is the route used by the overwhelming majority of the 65 lakh+ households already covered (see the November 2026 progress tracker).
  • RESCO: a Renewable Energy Service Company invests in the rooftop system at its own cost; you sign an agreement to pay only for the electricity the system feeds you, with no upfront payment (Energy Watch).
  • ULA (Utility-Led Aggregation): your DISCOM or a state-designated entity installs rooftop systems on behalf of households — typically at neighbourhood scale, often for PMAY, BPL and SC/ST beneficiaries (Energy Watch).

To make RESCO lending bankable, MNRE also created a ₹100 crore payment security mechanism — a corpus that protects RESCO investors against payment default in the residential segment (Energy Watch).

How the subsidy differs by route

The central subsidy amounts are fixed by the scheme regardless of route (official CFA note; Delhi Solar Portal):

System sizeHousehold CFA
1 kW₹30,000
2 kW₹60,000
3 kW₹78,000
Above 3 kW₹78,000 (capped)
GHS/RWA common facilities₹18,000 per kW, up to 500 kW (@3 kW per house)

What changes by route is who receives it. In the CAPEX route the CFA is paid to the household through the national portal. For RESCO and ULA projects, MNRE has issued separate guidelines governing how the CFA and the payment security mechanism flow through the project structure to the RESCO developer or the utility (Energy Watch) — as a household on those routes, you do not handle subsidy paperwork; the benefit reaches you through the tariff or agreement you sign.

RESCO vs CAPEX: side-by-side comparison

DimensionCAPEX (national portal)RESCO (developer-funded)ULA (DISCOM-led)
Upfront costFull system cost minus CFA; collateral-free loans availableNoneNone
System ownershipYouDeveloperUtility/state entity
Who claims the CFAYou, via the portalThrough project guidelinesThrough project guidelines
Monthly outgoNear-zero after paybackPay per unit consumedPay per unit consumed
MaintenanceYour responsibility (O&M contract)Developer's responsibilityUtility's responsibility
TenureNone — you own from day oneMulti-year agreementMulti-year agreement
Best forHomes able to pay or take a loanHomes wanting zero investment without DISCOM involvementLow-income (PMAY/BPL/SC/ST) households at scale

Sources for the model definitions and payment security mechanism: Energy Watch; subsidy amounts: official CFA note.

Worked example: a 3 kW home

Take a home consuming more than 300 units a month — the official sizing mapping puts that household above 3 kW of rooftop capacity (MNRE CFA note). Expected generation for a 3 kW system in North Indian cities is covered city-by-city in our generation guide.

Subsidy arithmetic (identical in every state, before state top-ups):

  • 1 kW: ₹30,000 × 1 = ₹30,000
  • 2 kW: ₹30,000 × 2 = ₹60,000
  • 3 kW: ₹30,000 × 2 + ₹18,000 × 1 = ₹78,000
  • 5 kW: ₹78,000 (cap applies — no additional CFA beyond 3 kW)

So the marginal subsidy of upsizing from 3 kW to 5 kW is zero; the extra 2 kW is paid entirely by you (or by the developer, on a RESCO route). On the CAPEX route, collateral-free financing covers the balance: the scheme's cabinet note flagged loans around 7%, and the operating concessional rate is 5.75% (repo + 50 basis points), with 17.5 lakh loan-financed installations completed as of August 2026 (PM India; PIB). How the loan route works: Sun Wave.

When CAPEX is the better route

  • You can pay outright or service a collateral-free loan — the CFA is yours, and after payback the power is effectively free for the system's life.
  • You want the maximum subsidy benefit visible in your own bank account via DBT.
  • You value owning the asset (no long-term agreement, no per-unit tariff to a third party).
  • Your roof is straightforward and you are comfortable arranging O&M (see our O&M guide).

When RESCO or ULA is the better route

  • Upfront cash is not an option and you would rather pay only for electricity the system actually delivers.
  • You are in a state where the DISCOM is running ULA for your category (PMAY, BPL and SC/ST households are the current ULA focus) (PIB).
  • You do not want to manage vendors, subsidies or maintenance — the developer or utility carries the performance risk.
  • You accept a multi-year agreement with a per-unit rate in exchange for zero investment.

One nuance: some RESCO agreements include a buy-out clause that lets the household take ownership mid-term — worth checking before signing, because it preserves the option to convert to the CAPEX position later.

Rules for housing societies and RWAs

Group Housing Societies and RWAs have their own CFA window: ₹18,000 per kW for common facilities, including EV charging, up to 500 kW (at 3 kW per house), with the upper limit inclusive of individual rooftop plants installed by residents (official CFA note; Delhi Solar Portal). Practical implications:

  • A society's common-area plant and residents' individual systems draw from the same 500 kW cap — sequence applications accordingly.
  • Common-facility loads (lifts, pumps, basement lighting, EV chargers) are what the society plant offsets, not individual flat bills.
  • For the full structure — metering, billing residents, vendor selection at scale — see our housing societies and RWA solar guide.

How to apply on the national portal

  1. Register on pmsuryaghar.gov.in with your electricity connection details.
  2. Size the system: 0–150 units/month suits 1–2 kW; 150–300 units suits 2–3 kW; above 300 units suits over 3 kW (MNRE CFA note).
  3. Select a registered vendor and confirm the quote in the portal.
  4. After installation and inspection, the CFA is disbursed directly to your bank account.

The detailed version, with screenshots-level steps and timelines, is in our application walkthrough; to check a pending application, see status checking.

Own a factory, warehouse or commercial building instead? The same decision changes shape at commercial scale — open access, accelerated depreciation and PPA structures enter the picture. Start with the industrial model comparison or Sun Wave's industrial rooftop practice.

Frequently Asked Questions

Is the RESCO route really free?

Yes — in the RESCO model the developer invests in the rooftop system and you pay only for the electricity you consume, with no upfront cost. The trade-off is a multi-year agreement at a per-unit rate instead of owning the asset (Energy Watch).

Do I still get the ₹78,000 subsidy on the RESCO route?

The CFA applies to RESCO and ULA projects, but under MNRE's guidelines for those models it is administered through the project structure rather than paid into your bank account; the benefit reaches you through the tariff in your agreement (Energy Watch). On the CAPEX route, the subsidy is paid to you directly — up to ₹78,000 for 3 kW (official CFA note).

Which is cheaper over the system's life?

CAPEX. Once the system is paid off — helped by the CFA and any state top-up — the electricity it generates costs you nothing beyond maintenance, whereas a RESCO agreement continues to bill per unit for its tenure. Paying nothing upfront is easier on cash flow, but it costs more per unit over 20+ years.

What is the ULA model?

Utility-Led Aggregation: your DISCOM or a state-designated entity installs rooftop systems on behalf of households at scale. As of August 2026 it had completed 1.6 lakh installations for PMAY, BPL and SC/ST households across four states, with rollout sanctioned in 12 states (PIB).

Can a housing society choose the RESCO route?

Societies have a dedicated CFA window — ₹18,000 per kW for common facilities up to 500 kW — which they can combine with either delivery approach depending on what the state and vendors offer (official CFA note). Confirm the model your DISCOM supports before signing a society-level agreement.

Can I switch from RESCO to CAPEX later?

Some RESCO agreements include a buy-out clause that lets the household take ownership of the system partway through the term. If ownership matters to you, negotiate this clause before signing rather than assuming it.

What loan rate applies if I choose CAPEX?

Concessional collateral-free loans at 5.75% per annum (repo rate plus 50 basis points) have been offered under the scheme, with 21.87 lakh sanctions and 17.5 lakh completed loan-financed installations as of August 2026 (PIB).

Ready to Go Solar?

Get a free consultation and custom quote for your industrial or commercial facility. Start saving on energy costs today.

Get Free Quote