Is rooftop solar worth it for a unit in Delhi's industrial areas in 2026? For most Okhla, Naraina, Wazirpur and Bawana factories and flatted units, yes: a ₹1 per kWh generation incentive for five years stacks on Delhi's industrial tariff (₹7.75 per kVAh base, and real bills higher after surcharges), taking a 100 kW plant's simple payback to roughly two-and-a-half to three years.
TL;DR: Delhi's approved industrial areas, Okhla Phases I-III, Naraina, Wazirpur, Bawana, Narela, Jhilmil, Patparganj and more, can install rooftop solar up to 500 kW under net metering (DERC regulations). The Delhi Solar Energy Policy 2023 adds a generation-based incentive of ₹1/kWh for C&I consumers for the first 200 MW of deployment, paid for five years against your bill. A 100 kW plant at Sun Wave's reference rate of ₹23,000/kW ex-GST costs about ₹25 lakh with tax, saves about ₹8.4 lakh a year on energy plus roughly ₹1.2 lakh of GBI, and pays back in about two-and-a-half to three years.
Last verified: 19 November 2026
Jump to:
- Which Industrial Areas Can Install Solar
- What Delhi Industrial Power Really Costs
- The Delhi GBI for Commercial and Industrial Buyers
- What a Rooftop Plant Costs and Pays Back
- Net Metering Cap and Approvals
- DG Sets, CAQM and Backup Loads
- Frequently Asked Questions
Which Industrial Areas Can Install Solar
Delhi's approved industrial belt is a patchwork of estates and flatted-factory complexes managed by DSIIDC (since the DIDOM Act, 2010) and the Industries Department. The Labour Department's list of approved industrial areas includes:
| Area | Character | Solar fit |
|---|---|---|
| Okhla Phases I-III | Large mixed estate, electronics blocks, flatted factories | Large roofs on phase sheds; flatted units take smaller systems |
| Naraina Phases I-II | Engineering, packaging, textiles | Good roof availability in phase sheds |
| Wazirpur | Steel furniture, workshops | Large sheds, high daytime load |
| Bawana and Narela | Resettlement and modern estates, north-west Delhi | Among the largest contiguous roof areas in Delhi |
| Jhilmil, Patparganj, Shahzada Bagh, Anand Parbat, Mangolpuri, Badli, Mayapuri | Mixed sheds and flatted complexes | Case-by-case, structural checks matter |
Source: Government of NCT of Delhi, Labour Department list of approved industrial areas; DSIIDC Industrial Estate Management division.
Flatted-factory units (Jhandewalan, Okhla FFC) share roofs, which complicates ownership, those units should look at group housing-style shared models rather than individual systems.
What Delhi Industrial Power Really Costs
DERC's last full tariff revision created the FY 2021-22 schedule, which remains the operative base; adjustments arrive through monthly PPAC surcharges and other levies rather than headline tariff orders.
| Item | Value | Notes |
|---|---|---|
| Industrial energy charge (base) | ₹7.75/kVAh | FY 2021-22 schedule, still operative |
| Industrial fixed charge | ₹250/kVA/month | Base schedule |
| PPAC | Revised monthly | Adds a percentage on top; check your bill |
| Electricity duty and taxes | Additional | Per current Delhi levies |
Source: DERC tariff schedule (base FY 2021-22), DERC orders on PPAC revisions.
The result: Delhi C&I consumers' real blended rates run meaningfully above the ₹7.75 base once PPAC, duty and time-of-day effects land, our Delhi net metering guide tracks the discom-wise effective ranges and our Delhi EPC guide explains the schedule quirk in detail. For payback maths below we deliberately use only the ₹7.75 base, which makes the payback estimate conservative.
The Delhi GBI for Commercial and Industrial Buyers
Delhi's Solar Energy Policy 2023 (notified March 2024) provides a generation-based incentive of ₹1 per kWh for commercial and industrial consumers for the first 200 MW of deployment, paid for five years from commissioning:
| Consumer type | Monthly GBI |
|---|---|
| Residential, up to 3 kW | ₹3/kWh |
| Residential, 3-10 kW | ₹2/kWh |
| Group housing societies / RWAs (up to 500 kW) | ₹2/kWh |
| Commercial and industrial (first 200 MW deployed) | ₹1/kWh |
Source: Delhi Solar Energy Policy 2023, clause 4.4.1, Delhi Department of Power (solar.delhi.gov.in); policy operative period extended to 31 March 2030 by the amendment of 17 September 2026.
Key conditions from the policy and the Department of Power's standard operating procedure:
- The GBI is calculated on gross solar generation, no minimum or maximum generation cap.
- It is adjusted against your monthly DISCOM bill (BRPL, BYPL, TPDDL or NDMC); any excess beyond the bill is deposited to your bank account within seven days of the billing cycle.
- You apply for the GBI on the Delhi Solar Portal; DISCOMs release it only to genuine rooftop-solar connections covered by the policy.
- Systems must be commissioned within the policy's operative period (now 31 March 2030) to earn the full five years.
- The C&I quota is capped at the first 200 MW deployed, early movers get certainty; there is no published meter for how much of the 200 MW is already used.
What a Rooftop Plant Costs and Pays Back
Sun Wave prices qualifying CAPEX rooftop C&I projects at ₹23,000 per kW at 100 kW and ₹22,000 per kW at 500 kW, ex-GST (about ₹25 lakh with tax at the roughly 8.9% effective turnkey rate for 100 kW). PM Surya Ghar's central subsidy does not apply to commercial or industrial plants, the Delhi GBI above is the state-level benefit that does.
Worked example, 100 kW on an Okhla or Bawana shed roof:
| Input | Value | Basis |
|---|---|---|
| Cost | ₹23,00,000 ex-GST (~₹25,05,000 with GST) | Sun Wave reference rate; site survey final |
| Generation | 1,20,000 kWh/year (1,200 kWh/kWp) | Delhi irradiance; confirm in simulation |
| Self-consumption | 90% (1,08,000 kWh) | Daytime-running unit |
| Energy savings | 1,08,000 x ₹7.75 = ₹8,37,000/year | Base tariff only |
| GBI | 1,20,000 x ₹1 = ₹1,20,000/year for 5 years | Policy clause 4.4.1 |
| Simple payback | ₹25,05,000 / (₹8,37,000 + ₹1,20,000) ~2.6 years | Years 1-5; ~3.2 years on energy savings alone after GBI ends |
Because real tariffs after PPAC run above ₹7.75/kVAh, actual payback is likely faster than shown. Units with heavy evening loads export more surplus and recover slower; add BESS arbitrage if ToD peaks dominate your bill.
Net Metering Cap and Approvals
Under DERC's net metering regulations (as amended through 2026):
- Maximum system size: 500 kW per consumer connection under net metering, across all consumer categories.
- Approved capacity is also capped by your sanctioned load/contract demand and by 90% of the available distribution transformer capacity.
- Applications run through your DISCOM (BRPL, BYPL, TPDDL) or the Delhi solar portal; the full document-by-document flow is in our Delhi net metering guide.
- Residential readers (or society committees) should start with the Delhi home solar guide and the BSES/TPDDL home net metering explainer instead, PM Surya Ghar CFA and the higher residential GBI apply there.
DG Sets, CAQM and Backup Loads
Delhi sits inside the CAQM regime for NCR, which restricts diesel genset use and pushes industry toward cleaner backup. Solar plus storage displaces both the energy line and part of the backup line; see our CAQM DG restrictions analysis and the DG vs BESS comparison.
Frequently Asked Questions
Is rooftop solar worth it for factories in Okhla, Naraina or Bawana?
Yes for daytime-running units: a 100 kW plant costs about ₹25 lakh with GST, saves around ₹8.4 lakh a year at the ₹7.75/kVAh base tariff, and earns the ₹1/kWh GBI for five years, a simple payback near two-and-a-half to three years, faster once real post-PPAC tariffs are counted.
How big can my Delhi industrial solar system be?
Up to 500 kW under net metering, additionally limited by your sanctioned load and 90% of your distribution transformer's capacity. Most flatted-factory and shed units in Okhla, Naraina and Wazirpur land between 25 kW and 250 kW once roof and daytime load are counted.
What is the Delhi generation-based incentive for industry?
₹1 per kWh on gross solar generation for five years, for commercial and industrial consumers within the first 200 MW of deployment, under the Delhi Solar Energy Policy 2023 (operative to 31 March 2030 after the September 2026 amendment). It is credited against your DISCOM bill monthly; excess is paid to your bank account.
Do Delhi factories get PM Surya Ghar subsidy?
No. PM Surya Ghar's central financial assistance is only for residential consumers, RWAs and group housing societies. Industrial and commercial plants get no central capital subsidy, their economics rest on avoided tariff, the Delhi GBI and accelerated depreciation.
What does a 100 kW solar plant cost in Delhi?
About ₹23 lakh ex-GST at the ₹23,000/kW reference rate for qualifying CAPEX rooftop projects, roughly ₹25 lakh with GST at the effective turnkey rate. Final pricing follows a site survey; larger plants (500 kW) drop to ₹22,000/kW ex-GST.
Who approves net metering in Delhi?
Your distribution company, BRPL, BYPL or TPDDL (NDMC in its area), under DERC's net metering regulations. Approval checks sanctioned load, transformer capacity and system size against the 500 kW cap, followed by agreement, installation and inspection.
Sun Wave Technologies designs and installs rooftop solar for Delhi industrial units and the wider NCR belt, compare our Delhi NCR EPC shortlist, our Faridabad industrial solar delivery base, or the city-by-city installation guides.
Ready to Go Solar?
Get a free consultation and custom quote for your industrial or commercial facility. Start saving on energy costs today.
Get Free Quote