Industrial Solar in Agra 2026: Costs, Tariffs, Payback
Industry Solutions

Industrial Solar in Agra 2026: Costs, Tariffs, Payback

Sun Wave Technologies19 November 202610 min read

Is rooftop solar worth it for an Agra factory or footwear unit in 2026? Yes: with the grid at ₹7.10 per kVAh (11 kV) and a 100 kW rooftop plant costing about ₹23 lakh ex-GST, most daytime-running units recover the investment in roughly three years, and Agra's mix of electricity-hungry, export-facing clusters makes it one of the more natural solar cities in Uttar Pradesh.

TL;DR: Agra's industry runs on DVVNL power billed in kVAh, ₹7.10/kVAh plus ₹300/kVA per month at 11 kV under the UPERC tariff order for FY 2026-27. A 100 kW rooftop plant at Sun Wave's reference rate of ₹23,000/kW (ex-GST) generates about 1.2 lakh units a year and saves roughly ₹7.7-8.5 lakh annually for a unit that runs in daylight hours, giving a simple payback near three years. Uttar Pradesh allows industrial consumers net billing rather than full net metering, so plant size should follow daytime load. Sit inside the Taj Trapezium Zone? Solar generation on the roof creates no compliance problem, it displaces grid and diesel use.

Last verified: 19 November 2026

Jump to:

Why Agra Industry Fits Rooftop Solar

Agra's industrial base is concentrated, small-scale and electricity-driven, the profile where rooftop solar pays back fastest:

  • Footwear and leather. Agra is one of India's largest leather footwear hubs: an estimated 5,500-6,500 footwear manufacturing units employing over 100,000 people, concentrated in 16 areas of the city, with a designed capacity of about 2.5-3 lakh pairs a day (DC-MSME cluster diagnostic, 2019). Machines run on motors, cutting, stitching, lasting, and for components, injection moulding and grinding.
  • Footwear components. About 205 component units (plastic soles, heels, lasts, shoe sheets) operate around Foundry Nagar and Industrial Area Sikandra, mostly on LT connections of 50-215 kVA (TERI cluster profile). Electricity accounts for roughly 87% of the cluster's energy use; specific consumption runs 0.91-2.67 kWh per kg of product. Most units also hold DG sets for backup, expensive units solar and batteries can displace.
  • Iron foundries and engineering. Foundry Nagar hosts Agra's foundry belt, historically powered by coal and coke before the courts pushed the zone onto cleaner fuels.
  • Flour and dal mills, cold storage and food units round out the demand, much of it running through daylight hours.

Two things make this profile solar-friendly. First, most production happens between 9 am and 6 pm, when a rooftop plant generates, so units consume solar power directly instead of exporting it at a lower credited rate. Second, connections are mostly LT (below 75 kW) or small HT, where the per-unit grid tariff is highest relative to solar's levelled cost.

What Industrial Electricity Costs in Agra

Agra's distribution company is Dakshinanchal Vidyut Vitran Nigam Limited (DVVNL). UPERC sets one rate schedule for all five UP discoms (DVVNL, MVVNL, PVVNL, PuVVNL and KESCO); in its order dated 2 July 2026, the Commission kept the FY 2026-27 rates unchanged from the previous year.

Consumer categoryDemand chargeEnergy chargeNotes
HV-2 industrial, up to 11 kV₹300/kVA/month₹7.10/kVAhMost HT factories
HV-2 industrial, above 11 kV to 66 kV₹290/kVA/month₹6.80/kVAhLarger plants
LMV-6 industrial, below 75 kWLT slabLT slabMost footwear component units

Source: UPERC order dated 2 July 2026 on the ARR and tariff for FY 2026-27 of DVVNL, MVVNL, PVVNL, PuVVNL and KESCO, rate schedule (Annexure).

Three billing mechanics matter for a solar decision:

  1. kVAh billing. Consumers with 10 kW or more contracted load are billed in kVAh, so a poor power factor raises the units you pay for. There is no separate PF surcharge to claw back.
  2. Time-of-day. On the urban schedule, the energy charge swings 15% up or down by hour and season, ₹8.17/kVAh in summer evening peak, ₹6.03 in summer 5-10 am at 11 kV. Solar output lands mostly in normal or off-peak windows, so every self-consumed unit displaces power bought at full rates.
  3. Demand charges are sticky. Solar trims the energy line, not the ₹300/kVA demand line, so payback maths should count energy savings only.

What a Rooftop Solar Plant Costs

Sun Wave Technologies prices qualifying CAPEX rooftop C&I projects at ₹23,000 per kW at 100 kW and ₹22,000 per kW at 500 kW, ex-GST, about ₹23 lakh for 100 kW and ₹1.1 crore for 500 kW, with the final price set after a site survey and engineering scope. With the standard 70:30 supply-services split, the effective GST on a turnkey plant is about 8.9% (5% on modules since September 2025), taking a 100 kW plant to roughly ₹25 lakh with tax.

For comparison bands in other segments, residential benchmark costs, ground-mount or carport rates, use published government benchmarks rather than these C&I figures; the residential central subsidy (PM Surya Ghar) does not apply to commercial or industrial plants.

Worked Example: 100 kW on a Footwear Unit

Assumptions, stated so you can swap your own:

InputValueBasis
Plant size100 kWTypical for a 150-250 kVA unit
Cost₹23,00,000 ex-GST (~₹25,05,000 with GST)Sun Wave reference rate, site survey final
Generation1,20,000 kWh/year (1,200 kWh/kWp)Agra's irradiance; confirm in simulation
Self-consumption90% (1,08,000 kWh)Unit runs 8-10 h/day, six days a week
Tariff displaced₹7.10/kVAhUPERC FY 2026-27, 11 kV
Surplus 10%Credited at net-billing rateSee section below

Arithmetic:

  • Year-1 energy savings: 1,08,000 kWh x ₹7.10 = ₹7,66,800
  • Surplus export credit adds a smaller amount at the utility's average power purchase cost
  • Simple payback: ₹25,05,000 / ₹7,66,800 ~3.3 years (about 3.0 years ex-GST)

Over a 25-year life, with tariffs historically rising faster than solar degradation, the levelled cost of rooftop solar lands well under ₹2.50 per kWh against the ₹7.10 grid rate, but treat any supplier's IRR promise as a claim to verify, not a given. A second shift or added evening load stretches payback; a genset-replacement plan (see DG vs BESS backup) can shorten it.

Net Billing Rules in Uttar Pradesh

Uttar Pradesh does not offer industrial consumers the one-to-one net metering homes get. Industrial and commercial rooftop plants operate on net billing: the energy you export is credited at a rate linked to the utility's average power purchase cost, which is meaningfully below the ₹7.10/kVAh you pay to import. The practical consequence:

  • Size to daytime load, not to your annual consumption. A plant far bigger than your working-day load pushes more energy into the low-value export bucket.
  • The application, agreement and inspection flow runs through DVVNL on the UPPCL portal; our UP net metering guide for industry walks the process and the KESCO Kanpur guide shows the same rules inside Kanpur's utility.

Solar and Taj Trapezium Zone Compliance

Most of Agra's industry sits inside the Taj Trapezium Zone, about 10,400 sq km across Agra, Firozabad, Mathura, Hathras and Etah in UP and Bharatpur in Rajasthan, where the Supreme Court has, since the M.C. Mehta cases, banned coal and coke use and directed industry onto natural gas. In July 2026, the Court allowed the TTZ Authority to process around 400 pending applications for non-polluting MSMEs, units running on electricity or natural gas, including footwear, flour mills and paper, under a NEERI and Central Empowered Committee oversight mechanism.

For a factory owner the solar angle is simple: rooftop solar is on-site, non-polluting generation. It needs no fuel, emits nothing and displaces both grid imports and DG-set diesel. It does not replace the consents your unit needs from the Pollution Board or the TTZ Authority for expansion, but it aligns with exactly the profile (electricity-run, non-polluting) that the zone's rules encourage. CAQM's separate restrictions on diesel gensets across NCR add a further reason North Indian units are moving backup load to batteries and solar; see our CAQM DG restrictions guide.

Sizing and Technical Checks

Before you request quotes:

  • Meter 12 months of bills. Convert kVAh and connected load into a daytime-hours load profile, our monthly-units sizing method shows the arithmetic.
  • Roof area. A 100 kW plant needs roughly 550-650 sq m of usable, shadow-free roof; check structure and cover, per our rooftop area guide and structural load assessment.
  • Sanctioned load and transformer. Net-billing approval is tied to your connection; a sanctioned-load increase (Haryana guide, the DVVNL process is similar) may be needed for very large plants.
  • Quote comparison. Compare scope, not just ₹/kW, our EPC quote reading guide lists the line items that hide in the differences.

Frequently Asked Questions

What does a 100 kW solar plant cost in Agra?

About ₹23 lakh ex-GST at Sun Wave's reference rate of ₹23,000/kW for qualifying CAPEX rooftop projects, roughly ₹25 lakh with the approximately 8.9% effective turnkey GST. The final price depends on the site survey, structure and cable runs. Residential benchmark rates (used for PM Surya Ghar subsidy maths) do not apply to factories.

Which discom serves Agra industry?

Dakshinanchal Vidyut Vitran Nigam Ltd (DVVNL). UPERC's single rate schedule for FY 2026-27 covers DVVNL and the other four UP discoms at the same rates: ₹7.10/kVAh plus ₹300/kVA per month at 11 kV for HV-2 industrial consumers.

Do Agra factories get net metering?

Industrial consumers in Uttar Pradesh get net billing, not net metering: exported units are credited at a rate linked to the utility's average power purchase cost, lower than the import tariff. This is why plants should be sized to daytime load rather than total annual consumption.

Can factories claim any subsidy for solar in Agra?

No central capital subsidy applies: PM Surya Ghar's CFA is only for residential consumers, housing societies and group housing. Factories instead benefit from accelerated depreciation under the Income Tax Act and, for Delhi, a separate GBI that does not exist in UP. See our industrial solar tax benefits guide.

How does the Taj Trapezium Zone affect solar installation?

Rooftop solar is non-polluting generation and sits comfortably within TTZ rules, which target fuels, coal and coke are banned and industries were moved to natural gas. Solar does not substitute for your unit's own pollution consents, but it supports the electricity-run profile the zone's oversight encourages.

What payback should I expect?

Roughly three years for a daytime-running unit at Agra's base tariff: a 100 kW plant costing about ₹25 lakh with GST saves about ₹7.7 lakh a year at 90% self-consumption and ₹7.10/kVAh. Units with higher effective tariffs (TOD peaks, duty) recover faster; units running one light shift recover slower.


Sun Wave Technologies engineers and installs rooftop solar for factories and commercial units across the Delhi-NCR and Uttar Pradesh belt, see our Faridabad industrial solar reference projects and UP industrial solar overview, or compare Kanpur and Lucknow city guides.

Ready to Go Solar?

Get a free consultation and custom quote for your industrial or commercial facility. Start saving on energy costs today.

Get Free Quote