Punjab open access solar charges FY2026-27: what a C&I buyer pays
For FY2026-27 a Punjab C&I buyer on third-party solar open access pays the cross-subsidy surcharge (CSS) of ₹0.86/kWh for Large Supply consumers, an additional surcharge of ₹1.13/kWh (or ₹0.78/kWh for non-GEOA partial open access), and wheeling and transmission of 2% of the energy injected for in-state solar, plus 2.19% transmission loss and 1.5% to 4% distribution loss in kind. Group captive structures remove the CSS, which is why structure matters more than any single rate.
TL;DR: PSPCL's open access circulars for FY2026-27 fix CSS at 86 paise/kWh for Large Supply, wheeling at ₹2,54,092/MW/month (or 2% in kind for in-state solar), and the additional surcharge at ₹1.13/₹0.78 per kWh, which PSERC has continued provisionally beyond 30 September 2026 until a final order. On our worked example, third-party solar at a ₹3.50/kWh plant-gate price lands at ₹5.45 to ₹5.80/kWh against PSPCL's ₹5.90/kVAh large-industry energy charge, so the saving is thin unless the project qualifies as captive.
Last verified: 27 October 2026. Figures below come from PSPCL commercial circulars that circulate PSERC's orders, read in full on 27 October 2026. Where we could not read a primary document we say so.
In this guide:
- What changed in FY2026-27
- Master charges table
- Wheeling and transmission
- Cross-subsidy surcharge
- Additional surcharge (now provisional)
- Banking and losses
- Eligibility and application process
- Landed-cost worked example
- Frequently Asked Questions
For the basics of how open access works, start with our open access solar guide for India and the Green Energy Open Access Rules 2022 explainer. For a state-by-state view see the solar open access charges by state comparison.
What changed in FY2026-27
- Tariff order: PSERC issued the FY2026-27 tariff order for PSPCL and PSTCL on 6 March 2026 (Petition No. 70 of 2025), applicable 1 April 2026 to 31 March 2027. It sets the average cost of supply at ₹6.15/kWh, down from ₹7.15/kWh, according to PSERC's own press summary as reported by Royal Patiala.
- Industrial tariff cut: PSPCL's large-supply general industry energy charge is ₹5.90/kVAh (100 to 1,000 kVA) and ₹6.00/kVAh (above 1,000 kVA), per PSPCL Commercial Circular 09/2026.
- Additional surcharge reset: the half-yearly additional surcharge for April to September 2026 was set at ₹1.13/kWh and ₹0.78/kWh by PSERC's order of 11 June 2026 (Petition No. 27 of 2026).
- Provisional carry-over: on 30 September 2026 PSERC ordered, in suo-motu Petition No. 76 of 2026, that the existing surcharge continues provisionally from 1 October 2026 until a final order for October 2026 to March 2027 is issued. PSPCL circulated this as Commercial Circular 38/2026 on 9 October 2026.
- Captive banking rules: PSERC amended Regulation 11 of its Captive Power Regulations on 18 May 2026 (gazetted 30 May 2026), tying banking for renewable captive users to the Open Access Regulations, per PSPCL Commercial Circular 39/2026.
- 13th Amendment: PSERC notified the 13th Amendment to its Intra-State Open Access Regulations in May 2026, extending the green energy open access definition to renewable captive users and setting a 1 June to 31 May settlement period for banking, per Omnicore's regulatory tracker.
- Night wheeling waiver expired: the waiver of wheeling charges for 6 PM to 6 AM applied only from 1 May to 30 June 2026.
Master charges table
| Charge | Unit | Value | Order reference |
|---|---|---|---|
| Wheeling, long/medium-term open access | ₹/MW/month | 2,54,092 | PSERC order 6 Mar 2026; PSPCL CC-13/2026 as amended by CC-23/2026 |
| Wheeling, short-term open access | ₹/MWh | 619.72 | Same |
| Transmission and wheeling, in-state renewable (NRSE) supply | % of energy injected | 2% in kind, irrespective of distance | CC-13/2026, CC-23/2026 |
| Transmission and wheeling, renewable supply from outside Punjab | Full charges plus deviation charges | As applicable | CC-13/2026 |
| Transmission loss, OA customers at 132/220/400 kV | % in kind | 2.19% | CC-13/2026 (Regulation 30(2)) |
| Loss, OA customers at 66/33 kV | % in kind | 2.19% plus 1.50% | CC-13/2026 |
| Loss, OA customers at 11 kV | % in kind | 2.19% plus 4.00% | CC-13/2026 |
| Cross-subsidy surcharge, Large Supply | ₹/kWh | 0.86 | CC-13/2026 (Regulation 26(2)); valid 1 Apr 2026 to 31 Mar 2027 |
| Cross-subsidy surcharge, Non-Residential and Bulk Supply | ₹/kWh | 1.22 | CC-13/2026 |
| Additional surcharge, full OA, and partial OA including GEOA beyond contract demand | ₹/kWh | 1.13 | PSERC order 11 Jun 2026; PSPCL CC-27/2026 |
| Additional surcharge, partial OA excluding GEOA, up to contract demand | ₹/kWh | 0.78 | Same |
| Additional surcharge, 1 Oct 2026 to 31 Mar 2027 | ₹/kWh | Above rates continue provisionally; final order pending and will override | PSERC order 30 Sep 2026 (Pet. 76/2026); CC-38/2026 |
PSPCL's CC-13/2026 also states that other charges, including operating charges, UI and reactive energy charges, are levied under the Open Access and Tariff Regulations. We did not retrieve a primary figure for the SLDC and scheduling charges, so they are excluded from the example below.
Wheeling and transmission
The headline wheeling rate in the circulars is capacity-based: ₹2,54,092 per MW per month for long and medium-term open access and ₹619.72 per MWh for short-term open access. For solar, the more relevant rule is the renewable concession. When power from a non-conventional renewable energy project is consumed inside Punjab, transmission and wheeling are charged at 2% of the energy injected into the state grid, irrespective of distance, which in practice means the generator injects an extra 2% at the injection point.
Two conditions sit on that concession. Open access customers using such projects pay additional deviation charges if they over-utilise intra-state open access capacity. And where 132 kV or higher transmission is involved, 25% of the average revenue the distribution licensee realises from the additional injection passes to the transmission licensee. For renewable power generated outside the state, full transmission and wheeling charges plus deviation charges apply, so out-of-state solar is a different cost calculation. Our note on the ISTS charge waiver phase-out covers the inter-state side.
Cross-subsidy surcharge
PSPCL's CC-13/2026 fixes CSS under Regulation 26(2) of the PSERC Open Access Regulations, 2011 at 86 paise/kWh for Large Supply, 122 paise/kWh for Non-Residential and Bulk Supply, and nil for Domestic Supply. It states that CSS does not exceed 20% of the average cost of supply for any category, in line with Rule 13 of the Electricity (Amendment) Rules, 2022. With the average cost of supply at ₹6.15/kWh that cap works out to about ₹1.23/kWh, consistent with the 122 paise figure. The rates apply from 1 April 2026 to 31 March 2027.
Large Supply is the category most manufacturing plants fall into, which makes ₹0.86/kWh the number to model. Qualifying captive consumption is not charged CSS under the proviso to Section 42(2) of the Electricity Act, 2003. Our guides to group captive solar and the 26% equity rule and third-party sale versus group captive explain the structure and the compliance tests.
Additional surcharge (now provisional)
PSERC sets the additional surcharge half-yearly under Section 42(4) of the Act. For April to September 2026 the rates in PSPCL's circular are:
- ₹1.13/kWh for full open access consumers, and for partial open access consumers including Green Energy Open Access (GEOA) consumers for open access beyond their contract demand.
- ₹0.78/kWh for partial open access consumers excluding GEOA consumers for open access up to the contract demand they maintain with PSPCL.
PSPCL's circular says the charge is levied on actual open access power drawn from sources other than PSPCL, subject to PSPCL's contracted capacity remaining stranded during the period. The circular prices only the two cases above. It does not state a rate for a GEOA consumer taking open access within its contract demand, so confirm that treatment with PSPCL in writing before you model it as zero.
For October 2026 to March 2027, PSERC has not issued a final order. Its suo-motu order of 30 September 2026 continues the existing surcharge provisionally, and says any final order will apply from the date it specifies and override the interim position. Budget for repricing risk: the rates moved from ₹1.47 and ₹1.09 in the previous half-year to ₹1.13 and ₹0.78, according to MVA Pulse's report on the June order, so a movement either way is plausible. The same half-yearly pattern shows up in Haryana, where we track it on our Haryana open access charges page.
Banking and losses
Losses in kind. CC-13/2026 sets transmission loss at 2.19% for open access customers at 132/220/400 kV. At 66/33 kV the customer also bears 15% of the 10% distribution loss (1.50%), and at 11 kV 40% of it (4.00%), on top of the 2.19%.
Banking, green open access. The 13th Amendment lets banked energy carry forward month to month until the end of a settlement period running 1 June to 31 May, after which unused energy lapses without compensation, per the Omnicore tracker above.
Banking, captive renewable users. The amended Regulation 11 of the Captive Power Regulations allows banking on the terms of the Open Access Regulations, bars use of banked energy for third-party sale, and requires captive status under Rule 3 of the Electricity Rules, 2005 to be met each financial year. If it is not met, energy banked and used in the year is treated as infirm power and the consumer pays the relevant tariff category rate (per CC-39/2026).
PSPCL banking procedure. PSPCL's procedure for GEOA banking, as reported when it was circulated for approval in November 2025, proposed a 10% in-kind banking charge, a monthly carry-forward cap of 30% of the consumer's monthly consumption, no withdrawal during 1 June to 30 September or at peak hours, and no third-party sale of banked energy, per Mercom. We could not confirm the final approved text, so treat those numbers as the planning basis and obtain the approved procedure and model banking agreement before financial close.
Eligibility and application process
Who is eligible. Conventional intra-state open access has historically required 1 MW of contract demand under PSERC's 2011 Regulations; we did not re-verify that threshold against the current consolidated text. Under the Green Energy Open Access Rules 2022, consumers with 100 kW or more can buy renewable power through open access, and PSERC's 13th Amendment brings renewable captive users into the GEOA framework. PSPCL's draft banking procedure described a GEOA consumer as one with sanctioned load or contract demand of 100 kW or more, singly or by aggregating connections within the same licensee's area, connected at 11 kV or higher (per SolarQuarter).
Typical sequence.
- Confirm category, voltage and contract demand from your PSPCL bill.
- Obtain connectivity and feasibility clearances, then apply for open access to the nodal agency, which is the SLDC or PSTCL depending on the transaction.
- Sign the connectivity, power purchase or wheeling agreements, and install 0.2S-class ABT meters at injection and drawal points, which the banking procedure requires.
- If you will bank energy, apply to PSPCL's Chief Engineer (Power Purchase and Regulations) in Patiala at least one month before availing banking, then execute a tripartite banking agreement, per the procedure as reported.
- If you need standby supply, use the model standby agreement in PSPCL CC-20/2026.
- The SLDC accounts for energy and issues monthly statements that PSPCL uses to bill you.
Net metering is the simpler alternative up to its caps. See our PSPCL net metering guide for industry.
Landed-cost worked example: 800 kVA factory at 11 kV
Assumptions (illustrative, not a quote). An 800 kVA PSPCL Large Supply general industry consumer at 11 kV keeps its contract demand and takes in-state solar by long-term open access. Solar costs ₹3.50/kWh at the plant gate. We apply the 2% in-kind transmission and wheeling charge plus the 2.19% and 4.00% losses from CC-13/2026 additively, an 8.19% total, so 0.9181 kWh reaches the meter per kWh injected. That is a conservative reading, and the SLDC should confirm the accounting. The avoided cost is PSPCL's ₹5.90/kVAh energy charge for 100 to 1,000 kVA.
| Line (₹/kWh delivered) | Third-party, AS ₹1.13 | Third-party, AS ₹0.78 | Group captive (CSS exempt) |
|---|---|---|---|
| Solar at plant gate | 3.50 | 3.50 | 3.50 |
| In-kind gross-up (8.19%) | 0.31 | 0.31 | 0.31 |
| CSS, Large Supply | 0.86 | 0.86 | 0.00 |
| Additional surcharge | 1.13 | 0.78 | 0.00 (confirm with PSPCL) |
| Landed cost | 5.80 | 5.45 | 3.81 |
| PSPCL energy charge avoided | 5.90 | 5.90 | 5.90 |
| Saving per kWh | 0.10 | 0.45 | 2.09 |
What the table leaves out matters. Excluded: SLDC, scheduling and deviation charges, banking deductions, electricity duty, FPPAS, retained fixed charges (₹210/kVA/month on the contracted demand) and standby charges. Also, PSPCL's circular carries a Government of Punjab memo of 4 March 2026 providing a subsidised ₹5.835/kVAh energy charge for eligible industrial manufacturing and IT/ITES units, with conditions we did not fully verify. If your connection qualifies, the avoided cost falls to about ₹5.84 and the third-party savings shrink to roughly ₹0.04 and ₹0.39. If the captive column also carries the additional surcharge at ₹1.13, its landed cost is ₹4.94 and the saving about ₹0.96, so verify captive treatment of the additional surcharge before relying on the 2.09 figure.
The practical reading is that third-party open access at this PPA price barely beats PSPCL's reduced industrial tariff, while a compliant captive structure still saves materially. A lower PPA price or rooftop self-consumption can change that, so size the plant to your daytime load using our factory solar sizing guide.
Frequently Asked Questions
What are the open access charges in Punjab for FY2026-27?
For FY2026-27, PSPCL's circulars set wheeling at ₹2,54,092/MW/month (long and medium term) or ₹619.72/MWh (short term), with in-state renewable power charged 2% of injected energy for transmission and wheeling. CSS is ₹0.86/kWh for Large Supply, and the additional surcharge is ₹1.13 or ₹0.78/kWh. Losses of 2.19% plus 1.5% to 4% apply in kind depending on voltage.
What is the cross-subsidy surcharge in Punjab for industry in 2026-27?
PSPCL Commercial Circular 13/2026 sets CSS at 86 paise/kWh for Large Supply, 122 paise/kWh for Non-Residential and Bulk Supply, and zero for Domestic Supply, valid 1 April 2026 to 31 March 2027. It is capped at 20% of the average cost of supply, which PSERC fixed at ₹6.15/kWh for FY2026-27.
What is the additional surcharge for open access in Punjab from October 2026?
PSERC has not issued a final order for 1 October 2026 to 31 March 2027. By its order of 30 September 2026 the previous rates, ₹1.13/kWh for full open access and GEOA beyond contract demand and ₹0.78/kWh for non-GEOA partial open access, continue provisionally. A final order, when issued, overrides them from the date it specifies.
How are wheeling charges calculated for solar open access in Punjab?
For in-state solar, PSPCL's circulars charge transmission and wheeling at 2% of the energy injected, regardless of distance, instead of a per-unit rate. Other long and medium-term open access pays ₹2,54,092/MW/month. Solar from outside Punjab pays full transmission and wheeling plus deviation charges.
Is green open access available for 100 kW consumers in Punjab?
Yes, in principle. The central Green Energy Open Access Rules 2022 lower the threshold to 100 kW, and PSERC's 13th Amendment includes renewable captive users in the GEOA framework. PSPCL's draft banking procedure described eligible consumers as 100 kW or more at 11 kV or higher. Confirm connectivity and the nodal agency before you sign a PPA.
How does banking work for solar open access in Punjab?
Banked energy carries forward month to month within a 1 June to 31 May settlement period and lapses afterwards without compensation, and it cannot be sold to third parties. PSPCL's procedure as reported proposes a 10% in-kind charge and a 30% monthly cap, which we could not confirm as final.
Is open access solar cheaper than PSPCL power for a factory?
Only narrowly on third-party terms. At a ₹3.50/kWh plant-gate price, our example lands at ₹5.45 to ₹5.80/kWh against ₹5.90/kVAh for large-supply industry, before SLDC, banking and duty. A qualifying group captive structure avoids CSS and lands near ₹3.81/kWh. Run your own numbers with the actual contract demand and tariff category.
Sources
- PSPCL Commercial Circular 13/2026, Open Access Charges for FY2026-27, 10 March 2026
- PSPCL Commercial Circular 23/2026, amendment to wheeling charges, 29 April 2026
- PSPCL Commercial Circular 27/2026, additional surcharge April to September 2026, 22 June 2026
- PSPCL Commercial Circular 38/2026, additional surcharge from 1 October 2026, 9 October 2026
- PSPCL Commercial Circular 09/2026, tariff structure for FY2026-27, 10 March 2026
- PSPCL Commercial Circular 39/2026, Captive Power Generation (First Amendment) Regulations, 2026
- PSPCL Commercial Circular 20/2026, standby power agreement for open access customers
- PSERC tariff order summary for FY2026-27 (Royal Patiala, 6 March 2026)
- Omnicore: PSERC 13th Amendment to the Intra-State Open Access Regulations, 2026
- Mercom: Punjab draft banking guidelines for GEOA consumers, November 2025