Madhya Pradesh Open Access Solar Charges FY2026-27
Open Access

Madhya Pradesh Open Access Solar Charges FY2026-27

Sun Wave Technologies22 October 202613 min read

Madhya Pradesh open access solar charges FY2026-27: what a C&I buyer pays

For FY2026-27, MPERC's retail supply tariff order sets wheeling at ₹0.17/kWh at 33 kV and ₹0.69/kWh at 11 kV, cross-subsidy surcharge (CSS) at ₹1.49/kWh for HV-3.1 industrial consumers and ₹0.90/kWh for HV-3.4 power-intensive consumers, and an additional surcharge of ₹1.18/kWh. Qualifying captive and group captive consumption is exempt from CSS and additional surcharge, and open access inside contract demand does not attract the additional surcharge.

TL;DR: MPERC's order of 26 March 2026 (Petition No. 140/2025) fixes the Madhya Pradesh open access stack at wheeling ₹0.17 (33 kV) or ₹0.69 (11 kV), CSS ₹1.49 (HV-3.1) and additional surcharge ₹1.18 per kWh, with banking governed by MPERC's 17 August 2026 SOP (8% in kind, three-month cycle, 30% cap). In our worked example at a ₹3.50/kWh solar price, third-party supply inside contract demand lands at about ₹6.33/kWh against a ₹6.70/kWh grid energy charge, while a group captive structure lands at about ₹4.84/kWh.

Last verified: 27 October 2026. Rates below are read from the MPERC order and the MPERC banking SOP themselves. Items we could only confirm through trade press are labelled.

In this guide:

  • What changed in FY2026-27
  • Master charges table
  • Wheeling, transmission and losses
  • Cross-subsidy surcharge
  • Additional surcharge and contract demand
  • Banking under the 17 August 2026 SOP
  • Eligibility and application process
  • Landed-cost worked example
  • Frequently Asked Questions

New to open access? Read our open access solar guide for India and the Green Energy Open Access Rules 2022 explainer first. For how Madhya Pradesh compares with other states, see the solar open access charges by state comparison.

What changed in FY2026-27

  • New tariff order: MPERC issued the ARR and Retail Supply Tariff Order for FY2026-27 on 26 March 2026 (Petition No. 140/2025). The tariff takes effect seven days after the DISCOMs publish their public notice, so check the date on your bill. It applies until amended by MPERC.
  • Open access charges moved: according to Mercom India, CSS rose from ₹1.43 to ₹1.49/kWh, the additional surcharge fell from ₹1.24 to ₹1.18/kWh and wheeling fell from ₹0.19 to ₹0.17/kWh. Those prior-year numbers are Mercom's, not ours.
  • Grid tariff up: Mercom reports higher fixed and energy charges for industrial consumers. MPERC's HV-3.1 industrial schedule is ₹7.75/kWh up to 50% load factor and ₹6.70/kWh above it at 33 kV, with ₹641/kVA/month fixed charges.
  • Billing rules clarified: MPERC's Sixth Amendment to the Intra-State Open Access Regulations (February 2026) separates open access within contract demand, above it, and hybrid cases, per Mercom India.
  • Banking SOP: on 17 August 2026 MPERC issued a Standard Operating Procedure for Banking of Power for GEOA consumers.
  • Standby charge: the order sets standby charges for GEOA consumers at 0.25 times the tariff applicable to the consumer, over and above the normal tariff.

Master charges table

ChargeUnitValueOrder reference
Wheeling, 33 kV₹/kWh0.17MPERC order, Petition 140/2025, Table 89
Wheeling, 11 kV₹/kWh0.69Same, Table 89
Wheeling, LT₹/kWh1.19Same, Table 89
Cross-subsidy surcharge, HV-3.1 industrial₹/kWh1.49 (capped at 20% of cost of supply)Same, Table 96
Cross-subsidy surcharge, HV-3.4 power-intensive₹/kWh0.90Same, Table 96
Cross-subsidy surcharge, LV-4 LT industrial₹/kWh1.49Same, Table 96
Additional surcharge₹/kWh1.18, applies from the order's applicability dateSame, Table 98 and paragraph 3.40
Average transmission cost used in CSS formula₹/kWh0.90Same, Table 93 (not a billed rate)
Losses used in CSS formula%EHT 3.83, 33 kV 3.57, 11 kV 4.47, LT 5.18Same, Table 92
Standby charge, GEOA consumersmultiple of tariff0.25 times, over and above normal tariffSame, general terms
Banking charge% of banked energy, in kind8%MPERC banking SOP, 17 Aug 2026
Banking cap% of monthly consumption30%Same
Banking cyclemonths3 (banking month plus two)Same

The order says wheeling and CSS applicability depends on each consumer's connectivity and on the Intra-State Open Access Regulations, 2021 read with the 2023 methodology regulations for green energy open access. It also notes that the DISCOMs must compute CSS for connectivity combinations other than the illustrated ones.

Wheeling, transmission and losses

MPERC allocates wheeling cost by voltage and sets the per-unit charge at ₹0.17/kWh for 33 kV, ₹0.69/kWh for 11 kV and ₹1.19/kWh for LT. Connecting a plant at 33 kV rather than 11 kV changes the delivered cost of every unit, so the interconnection voltage is a design decision, not a detail. The order's wheeling table covers only 33 kV, 11 kV and LT and leaves out energy wheeled at 132 kV, so a consumer connected at EHT should get written confirmation of whether any distribution wheeling applies.

Transmission is set separately. The order uses an average transmission cost of ₹0.90/kWh (PGCIL charges plus MPPTCL charges including SLDC, divided by units handled) inside the CSS formula, but that is a computation input, not the rate on your invoice. The charge you actually pay depends on your injection and drawal points and on MPPTCL's own tariff order, so obtain it in writing for your path. Losses used in the order's CSS illustration are 3.83% at EHT, 3.57% at 33 kV, 4.47% at 11 kV and 5.18% at LT.

Cross-subsidy surcharge

CSS is the difference between the category's average tariff and the cost of serving the same consumer from the open access source, and it cannot exceed 20% of the average cost of supply. For FY2026-27 that ceiling is ₹1.49/kWh, and it binds for most categories. HV-3.1 industrial pays ₹1.49/kWh (the tariff-based figure of ₹3.31/kWh is capped), while HV-3.4 power-intensive industries pay ₹0.90/kWh. Where the computed CSS would be negative, it is billed as zero.

Qualifying captive consumption is not charged CSS under the proviso to Section 42(2) of the Electricity Act, 2003. Our guides to group captive solar and the 26% equity rule, the broader group captive framework and third-party sale versus group captive explain how to qualify and keep that status.

Additional surcharge and contract demand

MPERC computed the additional surcharge as the average fixed cost of thermal generating stations, ₹1.18/kWh (₹10,539.09 crore over 89,147.81 MU), to be levied in addition to CSS from the date the order becomes applicable. The DISCOMs had claimed ₹1.53/kWh.

Whether you pay it depends on contract demand. Under MPERC's Sixth Amendment as summarised by Mercom India:

  • Open access within contract demand: energy adjustment only, no demand adjustment in billing demand, and no additional surcharge.
  • Open access above contract demand: technical feasibility is assessed on total load, energy and demand are adjusted in 15-minute blocks, and the additional surcharge applies to open access energy except power from captive generating plants.
  • Hybrid: the additional surcharge applies only to energy corresponding to the portion above contract demand.

Because the amendment text is the controlling document, read Regulation 13.2 as amended before you finalise a contract-demand strategy.

Banking under the 17 August 2026 SOP

MPERC's SOP for Banking of Power applies to GEOA consumers connected to the intra-state transmission or distribution system. Its main terms:

  1. Three-month cycle. Energy banked in month n can be drawn in months n+1 and n+2. Undrawn energy lapses at the end of the cycle, and the generator earns RECs equal to the lapsed energy. A consumer can ask once per financial year to extend a cycle, up to the end of the financial year and subject to feasibility.
  2. 30% cap. Banked energy in a month is limited to 30% of the consumer's monthly consumption from the DISCOM, with excess reduced proportionately across time blocks.
  3. 8% in kind. The banking charge is 8% of banked energy, deducted in kind, as approved by MPERC from time to time.
  4. Application timing. For long and medium-term open access, apply to the distribution licensee at least 15 days before banking starts. For short-term open access, apply together with the open access application.
  5. Scheduling. Drawal of banked energy follows a 15-minute scheduling request, and the DISCOM must provide the banked-energy statement within three working days of month-end.
  6. No net metering. A GEOA consumer using banking is not eligible for net metering.

The practical implication for a 1 to 3 MW plant is to size against your daytime consumption and keep the surplus well inside the 30% cap, because anything above the cap or undrawn at cycle end is lost.

Eligibility and application process

Eligibility. MPERC's order states that non-renewable open access consumers need a contract demand of 1 MW or more, connected at 33 kV or above, while renewable energy users with capacity of 100 kW or more are eligible subject to the absence of operational constraints in the licensee's system.

Typical sequence.

  1. Confirm your tariff category (HV-3.1 industrial or HV-3.4 power-intensive), voltage and contract demand.
  2. Obtain connectivity approval and open access permission from the designated nodal agency (MPPTCL or the MP SLDC at Jabalpur, depending on the transaction type), through the green open access process in the Green Energy Open Access Rules 2022.
  3. Sign the connectivity agreement, power purchase and wheeling agreements, and install 0.2S-class ABT meters at both ends, which the SOP requires.
  4. For banking, submit the SOP's documents to the DISCOM: board resolution or authorisation, connectivity and PPA documents, meter test reports, a generator NOC and a no-dues certificate.
  5. Schedule in 15-minute blocks and settle monthly statements.

Landed-cost worked example: 33 kV HV-3.1 factory

Assumptions (illustrative, not a quote). A factory taking HV-3.1 industrial supply at 33 kV buys solar at ₹3.50/kWh at the plant gate from a plant connected at EHT. We apply the order's illustration losses of 3.83% (transmission) and 3.57% (33 kV), the 33 kV wheeling charge of ₹0.17 and, as a planning proxy only, the ₹0.90/kWh average transmission cost from Table 93. The avoided cost is the HV-3.1 33 kV energy charge above 50% load factor, ₹6.70/kWh.

Line (₹/kWh delivered)Third-party, within contract demandThird-party, above contract demandGroup captive
Solar at plant gate3.503.503.50
Loss gross-up (3.83% and 3.57%)0.270.270.27
Transmission (proxy)0.900.900.90
Wheeling, 33 kV0.170.170.17
CSS, HV-3.11.491.490.00
Additional surcharge0.001.180.00
Landed cost6.337.514.84
Grid energy charge avoided (above 50% load factor)6.706.706.70
Saving per kWh0.37(0.81)1.86

If your load factor is below 50%, the avoided energy charge is ₹7.75/kWh and the savings improve by ₹1.05. Three things the table leaves out cut the other way or add cost: retained fixed charges (₹641/kVA/month at 33 kV), SLDC and scheduling charges, banking deductions and deviation settlement. MPERC's HV-3 schedule also gives a ₹1/kWh rebate on incremental consumption or on new HT connections for a period, which lowers the avoided cost if you qualify. Finally, we applied no concessions for renewable open access, because we did not verify any in the 2023 GEOA charges regulations; if your project qualifies for a transmission or wheeling concession, your landed cost falls.

The reading is straightforward. Third-party open access beats the grid only inside contract demand, and only by a small margin at this price, so group captive is where Madhya Pradesh's economics are strongest. Size the plant against actual load using our factory solar sizing guide. For the state's wider solar procurement picture, see Madhya Pradesh's record ₹2.70/unit Morena solar-plus-storage tariff, and for a neighbouring comparison read our Rajasthan open access charges page.

Frequently Asked Questions

What are the open access charges in Madhya Pradesh for FY2026-27?

Under MPERC's order of 26 March 2026, wheeling is ₹0.17/kWh at 33 kV and ₹0.69/kWh at 11 kV, CSS is ₹1.49/kWh for HV-3.1 industrial and ₹0.90/kWh for HV-3.4 power-intensive consumers, and the additional surcharge is ₹1.18/kWh. Transmission is billed separately, and banking costs 8% in kind.

What is the cross subsidy surcharge in Madhya Pradesh for industry?

For FY2026-27 MPERC set CSS for HV-3.1 industrial consumers at ₹1.49/kWh, which is the 20% of average cost of supply ceiling, and at ₹0.90/kWh for HV-3.4 power-intensive industries. Qualifying captive consumption is exempt under Section 42(2) of the Electricity Act.

Is additional surcharge applicable on open access in MP?

Yes, at ₹1.18/kWh, but not on open access within your contract demand, according to MPERC's Sixth Amendment as summarised by Mercom India. It applies to open access energy above contract demand, except power from captive generating plants. Confirm the treatment of your connection with the DISCOM.

What are the banking rules for solar open access in Madhya Pradesh?

MPERC's SOP of 17 August 2026 allows banking in a three-month cycle, capped at 30% of monthly consumption from the DISCOM, with an 8% in-kind charge. Undrawn energy lapses at cycle end and the generator earns RECs. Apply at least 15 days before banking starts for long and medium-term open access.

Who is eligible for green open access in Madhya Pradesh?

MPERC's order says renewable energy users with capacity of 100 kW or more are eligible, subject to operational constraints, while non-renewable open access needs 1 MW of contract demand at 33 kV or above. Applications go through the nodal agency under the Green Energy Open Access Rules 2022.

Is group captive solar exempt from open access charges in Madhya Pradesh?

Qualifying captive and group captive consumption is exempt from CSS and, per MPERC's Sixth Amendment, from the additional surcharge. It still pays wheeling, transmission, losses and any banking charge, and it must keep captive status each year to retain the exemption.

Is open access solar cheaper than MP grid power for a factory?

Only modestly on third-party terms. At ₹3.50/kWh, our 33 kV example lands at about ₹6.33/kWh within contract demand against ₹6.70/kWh grid energy charge, and above contract demand it costs more than the grid. A group captive structure lands near ₹4.84/kWh. Model your own contract demand and load factor.