Direct Answer

India's secondary steel sector — roughly 1,100 induction furnaces and 1,300 re-rolling mills — runs on electricity first and fuel second: melting alone draws 75–80% of energy input as power, at 420–755 kWh per tonne of liquid steel. That makes power cost a board-level issue, but it also creates a mismatch: furnaces melt on night-heavy shifts while solar produces by day. The honest answer is that rooftop solar alone typically offsets only 15–30% of a night-shift mill's consumption. The complete solution pairs rooftop solar for daytime auxiliary, re-rolling and office loads with a group captive open-access stake (26%+ equity) that replaces grid power at ₹7–8/kWh with renewable supply around ₹4.5–6/kWh — cuts of up to a third in delivered power cost are credible for secondary steel MSMEs.

TL;DR

  • Melting is electricity-led and night-heavy: for IF and EAF units power can reach 40% of operating cost, which rooftop solar alone cannot serve directly.
  • Rooftop solar is still worth building: re-rolling stands, auxiliaries, compressors, water systems and offices run by day and can absorb meaningful capacity.
  • The big lever is group captive open access at 26%+ equity — modelling for a 5 MW industrial share suggests a ~20% tariff cut with payback in 1–2 years.

Where the power goes in a rolling mill or foundry

India's secondary steel route — the ~1,103 induction furnaces and 1,313 re-rolling mills that account for roughly 40% of national crude steel output — is overwhelmingly small-scale: about 75% of re-rolling mills operate at 24–240 tonnes per day. Energy studies (TERI/GIZ, 2023) put specific energy consumption (SEC) at 420–755 kWh per tonne of liquid steel for IF/EAF routes, with electricity contributing 75–80% of total energy input. Re-rolling adds a further 80–150 kWh per tonne of electrical demand, while reheating accounts for roughly 77% of the route's thermal (fuel) demand.

The commercial consequence is stark: for induction and EAF units, electricity can reach 40% of operating cost. Any energy strategy that treats power as a fixed, unmanageable input leaves serious money on the table — and the grid tariff gap makes it worse, with industrial supply at roughly ₹7–8/kWh against renewable alternatives at ₹4.5–6/kWh.

The load-mismatch problem, stated honestly

Most rooftop solar content assumes a neat overlap between production and sunshine. For steel melting, that assumption fails. Induction furnaces and EAFs are typically run on night-heavy shifts for three reasons: off-peak or ToD tariff structures, transformer and demand-charge planning, and the simple physics of keeping a melt shop continuously hot. Solar produces nothing at 11 p.m., which is precisely when the melt deck is busiest.

The result, echoed in recent sector analysis (JMK Research / pv magazine India, August 2026), is that rooftop solar on its own offsets a minority share — realistically 15–30% — of a night-shift mill's consumption. Any proposal promising more from rooftop alone in a melt-shop business should be treated with scepticism.

What rooftop solar can realistically cover

That 15–30% figure is not a reason to skip rooftop — it is a reason to size it correctly against the right loads. A mill or foundry is not one load; it is several:

Load segmentShare of plant electricityWhen it runsSolar fit
Induction / EAF meltingLargestNight-heavy shiftsPoor direct fit — serve via group captive OA instead
Re-rolling mill stand (80–150 kWh/t)SignificantLargely daytimeGood — mills often run day shifts
Auxiliaries: fans, cranes, water pumps, compressorsMeaningfulDay and shift-longGood to excellent
Lighting, offices, weighbridge, labModestDaytimeExcellent

Daytime loads are exactly what rooftop solar serves best, and self-consumption in a plant with this profile is typically high because the load is large, stable and on-site. Units in the Delhi-NCR, Haryana, Rajasthan and UP belt can expect solid per-kW yields; a sense of realistic generation is covered in our guide to solar units generated per kW in North Indian cities. Structural suitability matters too — melt-shop and mill sheds are usually robust steel structures, but a formal roof structural load assessment for solar is standard practice.

Group captive: the lever that actually moves the bill

For the melting load itself, the proven instrument is group captive open access. Under the group captive framework, the industrial consumer holds at least 26% equity in the generating asset and consumes the output through the open-access network — which is why the structure is often summarised as group captive solar at 26% equity.

The August 2026 analysis cited above concludes that group captive arrangements can cut power costs for secondary steel MSMEs by up to 34%, moving delivered power from the ₹7–8/kWh grid band toward the ₹4.5–6/kWh renewable band. A widely referenced modelling example — a Rajkot foundry taking a share of a 5 MW group captive plant — shows a tariff reduction of roughly 20%, an equity outlay of about ₹1.4 crore, and a payback of one to two years. Long-run economics can be benchmarked against published captive solar LCOSE figures for 2026.

For mills weighing open access routes in Haryana specifically — where cross-subsidy and additional surcharges shape the maths — our state-level guide to Haryana open access solar charges for FY 2026-27 is the practical companion read.

Batteries and time-of-day tariffs: emerging, not yet default

Two developments are softening the night-shift constraint. First, many discoms now price industrial power on time-of-day tariffs, which penalise evening peaks — a dynamic that affects when it pays to shift or store energy, covered in our ToD tariff and factory solar savings guide for 2026. Second, battery energy storage paired with solar is emerging as a way to serve evening auxiliaries and to arbitrage ToD spreads. For melt shops, storage today is best understood as an economic hedge on ToD exposure rather than a way to run a furnace on sunshine — the honest framing of the BESS business case for NCR industrial users. Night-shift BESS economics remain early-stage for most MSME mills; treat vendor payback claims with care.

A practical sequence for NCR mills

  1. Meter and segment loads by shift for one representative month — establish what actually runs between 9 a.m. and 4 p.m.
  2. Size rooftop to daytime load, not to total sanctioned load. Oversizing against a night-heavy profile only exports cheap power.
  3. Model a group captive share (26%+ equity) against the grid tariff for the remaining consumption, including open-access charges for your state.
  4. Revisit BESS once ToD exposure is quantified — not before.

Frequently Asked Questions

Can rooftop solar run an induction furnace?

Not directly for a night-shift melt. A single large furnace draw exceeds what a typical rooftop array can supply at any instant, and the furnace runs when the sun is down. Solar serves the daytime portion of the plant's demand; the melting load is addressed through group captive open access, which displaces grid tariffs across all hours.

Why does group captive require 26% equity?

Indian electricity rules define a "captive" generating plant as one in which the consumers hold at least 26% of the equity. Crossing this threshold unlocks the open-access and charge benefits that make the delivered tariff economics work — which is why credible developers build the structure around it.

How much of a night-shift mill's power can solar offset?

Typically 15–30% from rooftop alone, depending on how much re-rolling and auxiliary load runs in daylight. Adding a group captive stake addresses the remaining 70–85% at a lower tariff than grid supply.

What does industrial rooftop solar cost?

As indicative benchmarks for this market: around ₹23,000/kW at 100 kW scale and ₹22,000/kW at 500 kW scale, excluding GST. Actual pricing depends on structure, heights, cabling and evacuation infrastructure. Note that the referenced JMK Research analysis (December 2024) estimates delivered cost from own-capex rooftop solar at roughly ₹1.5 per unit for industrial consumers.

Is a battery worth adding to a foundry solar plant?

Usually not as the first step. Batteries make sense once time-of-day tariff exposure is measured and the daytime rooftop is fully consumed. For most secondary steel MSMEs today, rooftop plus group captive delivers the payback; storage is a second-phase decision.

Ready to Go Solar?

Get a free consultation and custom quote for your industrial or commercial facility. Start saving on energy costs today.

Get Free Quote